论高速铁路隧道消缺集中化弊端及前置化管理措施与意义
2020-06-29蔡福全
蔡福全
摘要:本文就高速铁路隧道缺陷对后期运营维护造成的隐患,及后期集中化消缺存在的弊端进行了阐述,指出高铁隧道消缺前置化管理的必要性,并就具體缺陷提出有针对性管理措施、论述了其作用与意义。该论文对提升高铁隧道施工质量,减少隧道质量缺陷具有借鉴参考价值。
关键词:隧道;消缺;前置化;管理;措施;意义
Abstract: This article describes the hidden dangers caused by the defects of high-speed railway tunnels in the later period of operation and maintenance, as well as the shortcomings of the centralized defect elimination in the later period. points out the necessity of pre-emptive management of high-speed railway tunnels, and proposes targeted management measures for specific defects, and discusses their functions and significance. This paper has reference value for improving the construction quality of high-speed railway tunnels and reducing tunnel quality defects
Key words: tunnel;elimination of defects;preposition;management;measures;meaning
0 引言
自2008年以来我国高速铁路建设发展迅速,据统计2020年我国高速铁路开通运营里程达到了3.5万公里,占世界高铁运营里程的70%,取得了令世界瞩目的建设成就。随着我国经济的持续发展,及高速铁路组网的需要,我国高铁建设将进一步扩容,并重点向山区及西部地区延伸,因此我国高铁隧道工程建设前景广阔。但由于隧道施工受地质水文影响较大且为隐蔽性工程,故工程质量控制难度大,易在施工过程中产生质量缺陷,给后期运营维护带来困难,甚至造成限速及重大安全质量隐患。因此如何采取有效的管理措施,及时查缺、消缺提升工程质量,对确保后期隧道的高可靠开通运营意义重大。
1 隧道质量缺陷的影响
隧道的质量缺陷影响面巨大,主要表现在以下三个方面:①隧道质量缺陷可能造成轨道板上浮引起列车限速,或是拱顶脱空、混凝土开裂掉块带来较大的行车安全隐患,并造成较大的不良社会影响。②隧道缺陷所造成的限速及安全隐患,会给参建单位带来不良社会影响,如列入企业不良信誉评价,影响阶段性招投标,甚至带来企业降资质的风险。……