浅析高校建设工程变更对造价管理的影响及管控对策

2020-02-14金晶

价值工程 2020年1期

金晶

摘要:本文从风险管理的视角,分析高校建设工程变更管理的常见问题,梳理引起工程变更及造价增加的关键环节和影响因素,在造价管理风险识别的基础上,制定科学的风险管理目标,有针对性地提出造价管理风险应对、风险监控的策略。从源头上加强建设工程变更管理,为有效识别造价管理风险,提高风险应对的靶向性,促进科学、合理控制工程造价,提供一种行之有效的管控对策。

Abstract: From the perspective of risk management, this paper analyzes the common problems of construction engineering change management in colleges and universities, sorts out the key links and influencing factors that cause engineering changes and cost increases, and formulates scientific risk management objectives based on cost management risk identification. Targeted strategies for cost management risk management and risk monitoring. Strengthen the construction project change management from the source, in order to effectively identify the cost management risk, improve the targeting of risk response, promote scientific and reasonable control of project cost, and provide an effective management and control strategy.

关键词:工程变更;造价管理;风险因素;管控对策

Key words: engineering changes;cost management;risk factors;management and control

中图分类号:TU723.3                                    文献标识码:A                                  文章编号:1006-4311(2020)01-0133-02

0  引言

工程变更往往是造价变动的主要因素,也是建设投资管控的关键环节。为此,从风险管理的视角,分析工程变更管理问题,梳理引起工程变更及造价增加的关键环节和影响因素,有针对性地提出变更管控对策,对于有效识别造价管理风险,提高风险应对的靶向性,促进科学、合理控制工程造价,具有突出的意义和价值。

1  工程变更的常见问题

1.1 工程前期工作不充分

由于建设工程设计方案考虑不周、设计图纸不详尽、项目需求不确定、合同条款订立不明晰、图纸会审不到位等原因,在工程实施过程中,容易出现调整、修改部分项目和方案的情况,导致大幅度变更。究其原因,主要是前期工作不充分。

1.2 变更决策管理不完善

有的工程变更随意性大、盲目性大,建了拆、拆了建的返工现象时有发生,造成资金浪费,甚至重大经济损失,暴露出不同类型的决策管理缺陷和漏洞。……