液压爬模施工技术要点分析

2018-05-14张鑫浩

成都工业学院学报 2018年3期
关键词:要点施工技术

张鑫浩

摘要:为了对液压爬模施工技术在超高层建筑核心筒剪力墙施工中的应用进行研究与分析,以合肥国购广场二期办公楼项目为例,对液压爬模技术的选型、方案设计与施工注意事项进行了研究。结果表明:液压爬模在超高层建筑施工中的应用能够有效避免过度吊装,同时还能进一步加快施工速度。但是在进行超高层建筑液压爬模施工过程当中建筑结构特征等因素对于液压爬模施工工艺存在着一定的影响。因此,在进行液压爬模施工之前必须要做好选型、方案设计等工作,在施工过程当中也必须要高度关注相关注意事项。

关键词:液压爬模;施工技术;要点;超高层

中图分类号:TU745.1 文献标志码:A

文章编号:2095-5383(2018)03-0044-03

Abstract:To study and analyze the application of hydraulic climbing formwork construction in the construction of core-tube shear wall of super high-rise building.

This paper takes the second phase office building project of Guogou Plaza in Hefei as an example to study the selection of hydraulic climbing formwork technology, Program design and construction precautions were studied.

The application of hydraulic climbing formwork in super high-rise building construction can effectively avoid excessive hoisting, and at the same time further accelerate the construction speed. However, the structural characteristics of the building during hydraulic climb construction of super high-rise buildings have some influence on the construction process of hydraulic climb construction.

Before the construction of hydraulic climb construction, it is necessary to do a good job of selection and design, In the construction process must also pay close attention to the relevant precautions.

Keywords:

hydraulic climbing mode; construction technology; essentials; super high-rise

近年来,随着我国超高层建筑建设范围的不断拓展,爬模的应用也得到了进一步推广。液压爬模是现阶段使用最为广泛的爬模施工技术,但由于对液压爬模施工技术了解不足,导致部分施工技术人员在液压爬模施工过程中存在多种问题[1-2]。因此,本文以合肥国购广场二期办公楼工程液压爬模施工为例对液压爬模施工技术要点进行分析。

1 工程概况

合肥国购集团投资建设的国购广场二期项目(以下简称本项目)中的办公楼为超高层建筑,建筑总高度为213 m,层高为4.2~5.5 m,其中核心筒采用剪力墙结构,外部则采用钢框架结构,核心筒位置的楼面板为钢筋混凝土板,外部为钢桁架。核心筒的剪力墙采用九宫格形式布置,剪力墙结构布置如图1所示。……

登录APP查看全文

猜你喜欢

要点施工技术
健康烹调的要点
A Teaching Plan —— How to Write a Summary of an Exposition
书写要点(十一)
书写要点
高层建筑主体结构施工技术及质量控制研究
施工技术在水利水电工程中的重要应用探究
水利水电工程建筑的施工技术及管理分析
试论关于水利工程冬季施工技术
道路桥梁施工中关于沉降段路基路面的施工技术
浅谈房屋建筑工程大体积混凝土施工技术