APP下载

基于FLAC—2D对基坑复合土钉支护中的数值模拟分析

2015-04-28高凤怀付连安张志豪

中华建设科技 2015年1期

高凤怀+付连安+张志豪

【摘要】针对16 m深基坑工程的所采用的超前微型桩+锚索的复合土钉支护方案为例,采用FLAC—2D程序,选用理想弹塑性Mohr-Coulomb屈服准则,模拟了基坑开挖与支护的过程,并对复合土钉与普通土钉两种支方案护的进行了比较。计算分析表明该复合土钉支护方案能有效地控制基坑变形,通过现场监测结果表明,实际工程中采用超前微型桩+锚索的复合土钉支护方案是技术可行的,同时表明数值模拟结果是合理的。

【关键词】复合土钉;超前微型桩;预应力锚索;数值模拟

【Abstract】Pointed to 16 m in deep foundation pit engineering of composite soil nailing with the advanced micro-pile and anchor support scheme, ,FLAC-2D method with elastic-plastic Mohr-Coulomb yield criterion is applied to simulat the excavation and supporting of foundation pit, and comparisons of displacement cures in composite soil nailing with soil nailing . Calculation and analysis show that the composite soil nailing support scheme can effectively control the deformation of foundation pit,. Comparisons with the field monitoring results confirm the composite soil nail scheme and the behavior analyzed by FLAC-2D.

【Key words】Composite soil nail;Advanced micro-pile;Pre-stressed anchor wire;Numerical simulation

1. 前言

随着高层建筑和地下空间的利用和发展,我国的深基坑工程日益增多,而且工程规模和技术要求的难度越来越大,传统的土钉支护方法由于其局限性已不能满足当前发展的需要。复合土钉支护作为对传统土钉技术的继承和发展,是一种新型、灵活多变、适用范围更广的岩土组合支护结构,它克服了传统土钉的许多局限性,具有广阔的发展前景。但是目前国内外对复合土钉支护的研究无论在理论分析设计还是在工程实践方面都还不够成熟与完善,对复合土钉支护的作用机理、稳定性分析的研究尚处于初级阶段。

本文采用FLAC—2D数值模拟,对基坑的复合土钉与普通土钉的两种支护方案的位移和应力分布情况进行探讨和分析,对工程实践有一定的指导意义。

2. 工程概况

21某基坑工程,主楼高35层,4层地下室,开挖设计深度16.0 m。基坑南侧有高压电缆箱涵及煤气管道平行通过,高压电缆箱涵埋深4 m,宽度约为2 m,紧临基坑,煤气管道位于箱涵外侧,埋深1.5 m,基坑边线距公路4 m。……