象鼻咀水库枢纽工程沥青混凝土心墙堆石坝现场碾压试验及分析
2012-04-23邓初松
摘要:为了确保象鼻咀水库枢纽工程沥青混凝土心墙堆石坝的填筑质量,施工前我们对强风化坝壳料、中风化坝壳料、过渡料和排水带料进行了现场碾压试验,验证了坝体分区及筑坝材料的级配设计是合理的。同时,通过现场碾压试验确定的大坝填筑的碾压设备及与之相匹配的碾压参数。
关键词:水库枢纽工程;沥青混凝土心墙堆坝;筑坝材料;现场碾压试验
Abstract: In order to ensure that the trunk Tsui Reservoir Dam Project asphalt concrete core rockfill dam filling quality, pre-construction, we strongly weathered dam shell material in weathering dam shell material, the transition material and drainage including material Field Compaction Testverified dam the partitions and dam material the the gradation design is reasonable. At the same time, through the Field Compaction rolling equipment testing to determine if the dam filling matched RCC parameter.Keywords: Reservoir Dam Project; asphalt concrete core wall heap dam; damming material; Field Compaction Test
中图分类号:TV62 文献标识码: A 文章编号:
1工程概况
象鼻咀水库枢纽工程位于四川省威远县连界镇先锋村与反帝村的界河(宝溪河)上,威远钢铁厂五号桥下游3.24km,距威远县城约38km。
水库正常蓄水位:583.00m ,死水位:554.00m ,校核洪水位:583.70,设计洪水位:583.00m ,正常蓄水位库容:533万m³,死库容:40.5万m³, 有效库容:492.5万m³,总库容542.3万m³。
象鼻咀水库大坝枢纽主要由沥青混凝土心墙堆石坝、放空洞、溢洪道等组成。其中,沥青混凝土心墙堆石坝,坝顶高程584.30m,坝顶宽6.00m,最大坝高55.30m,坝顶轴线长123.30m,沥青混凝土心墙高程在554.50m以上厚度0.55m,以下厚度0.6m。上游边坡为1:1.7,预制混凝土块护坡自552m(低于死水位2m)起上延至坝顶;坝下游坝坡1:1.7,设二级马道,马道宽度均为3m,高程分别为564.30m、542.80m,下游坝坡采用C15混凝土框格草皮护坡。下游主堆石底部设有堆石排水带,排水带底高程530.7m,顶高程535.0m,排水带下接下游贴坡排水。
坝料的分区及技术要求
2.1坝体断面及填筑材料的设计分区见图1。
(图1:坝体断面及填筑材料分区图)
2.2主堆石料(坝壳料)技术参数
堆石料最大粒径800mm,干密度≥2.05t/m3。该区采用弱风化~新鲜砂岩,最大粒径控制为800mm,小于5mm含量5~20%,小于0.075mm含量不大于5%,渗透系数控制为大于1×10-3cm/s。……