论客运专线的合同管理工作在施工企业项目中的地位和作用
2012-04-23唐永国
唐永国
摘要:本文从客运专线施工承发包合同有关费用调整的内容来分析出其固有特点,从而分析客运专线的合同管理工作在施工企业项目中的地位和作用。客运专线施工承发包合同有关费用调整最大的特点是其“不确定性”,由此决定了客运专线的施工企业的合同管理工作者面临着非常重大的责任,必须做到规避风险以减少损失,利用风险以获取巨大的经济效益。
关键词:合同管理;风险;不确定性;地位;作用
Abstract: This article from the passenger line construction contracting costs related to adjust the content to analyze its inherent characteristics analysis of passenger dedicated line, thereby the work of contract management in construction enterprise project in the status and role of. Passenger transport special railway line construction contracting costs related to adjustment is the biggest characteristic of the " uncertainty ", which determines the passenger dedicated railway construction enterprise contract management workers are faced with a very heavy responsibility, it must accomplish to avoid risks in order to reduce the loss, the use of risk to obtain enormous economic benefit.
Key words: contract management; risk; uncertainty; role position;
中图分类号:F715.4 献标识码: A 文章编号:2095-2104(2012)12-0020-02
铁道部根据国务院和国家发展改革委员会批准的《中长期铁路网规划》,从2004年开始拉开了大规模修建客运专线的帷幕。客运专线最直观的特点是“技术标准高、投资规模大”。目前在建的客运专线投资均在几百亿至上千亿不等,线路从一百多公里至一千多公里不等,一次性建成,均为国家Ⅰ级主干线。
客运专线的上述特点决定了大规模修建客运专线既为施工单位的发展和壮大提供了契机,也同时蕴含着潜在的风险,尤其是经济风险。
就客观分析施工单位亏损的主要原因首先是客运专线的中标价不能真实反映工程的费用,例如沿海某客运专线概算人工费定额价格水平为18.62~20.02元/工日,而福建省人工定额价格水平为36.00~48.00元/工日,高速公路人工定额价格水平为49.00元/工日,而且不进行人工费价差调整;另外一个原因是客运专线的施工承发包合同的合同条款对施工单位苛刻也是造成施工单位亏损的主要原因,这方面有两点非常显著,一是砂石料等地材的招标设计价与施工期的现行市场价相差甚大,且不进行材料价差调整;……