大跨度超高重型钢结构厂房结构设计浅析
2012-04-10郭鹏沈垒
郭鹏 沈垒
摘要:随着技术的进步,出现了越来越多的重型机械来帮助人们完成各种生产建设,极大的降低了人工劳动力。那么要承载起重型机械的生产就需要建设大量工业厂房,其中涉及到不少大跨度超高重型钢结构厂房。目前,建设这种厂房的很多技术难题都得到了攻克,本文就针对大跨度超高重型钢结构厂房的结构设计普遍使用的技术方案来展开讨论。
关键字:大跨度,超高重,钢结构,厂房
Abstract: with the development of technology, there are more and more heavy machinery to help people finish all kinds of production and construction, greatly reduced the artificial labor. So to load up heavy machinery production needs a large construction industry workshop, which involves a lot of large span heavy steel structure workshop high. At present, the construction of the factory building many technical problems have been conquer, this paper for big span structure factory building high the heavy steel structure design of the widespread use of technical solution to this discussion.
Key word: big span, ultra heavy, steel structure, plant
中图分类号:TU391文献标识码:A 文章编号:
引言:
随着改革开放的到来,我国的重工业得到了极大的发展,很大程度的推进了大跨度超高重的钢结构厂房的发展,这种厂房的修建不仅方便了生产者有效地工作,更促进了我国建筑业的发展。在克服困难的发展过程中会有很多经验和教训,很多专家也都将自己的心得体会写成文章供大家分享,下面就以本人做的一个单层单跨52.4m,高度60m,柱距24m,长度200的钢结构框架工程实例来做探讨。
1.设计条件
1)地震烈度7度(0.05g),基本风压0.8kN/m²,厂房位于港口,粗糙度属于A类;
2)厂房高51.05m处运行4台500t吊车,高24.225m处运行2台160t吊车,吊车均为A6类工作制,屋面墙面为轻型彩钢板围护。
2.结构选型
由于该厂房是属于大跨度,且超高超重的钢结构,要保证其结构稳定性和吊车运行的安全性,就要首先确保框架柱的刚度。其中的设计人员提出的方案为: 采用单阶三肢柱,柱肢截面为HW498×432,柱缀条采用φ219×16,屋架为三肢桁架,上下弦截面为HW400×400,腹杆为φ219×10。在进行结构分析计算时,选用3D3S计算软件,选取单榀框架进行平面分析,不考虑其空间作用,通过对此方案进行分析计算,其中位移和应力结果为:……p>
