浅析深基坑工程的质量控制
2012-04-10潘伟强
潘伟强
摘要:深基坑工程是土体与围护结构体系相互作用的一个动态变化的复杂系统,仅依靠理论分析和经验估计是难以把握在复杂等条件下基坑支护结构和土体的变形破坏,也难以完成可靠而经济的基坑设计。从最近几年的施工情况看,很多深基坑工程质量不达标后出现的返修、加固、补强等操作,这些造成了器材、能源、资金等各项资源的浪费,使得工程项目难以创造应有的价值。文章结合作者多年的工作经验,分析了深基坑工程的质量控制要点。
关键词:深基坑 准备工作 施工过程施工监测
Abstract: the deep foundation pit engineering is the soil and the palisade structure system of the interaction of the a dynamic changes of complex system, rely on the theoretical analysis and experience estimation is difficult in the complex conditions such as soil and the foundation pit supporting structure of deformation and destruction, also difficult to complete reliable and economic foundation pit design. From recent years of construction, we can see a lot of deep foundation pit engineering quality substandard of repair, appears after reinforcement, reinforcing operation, these caused the equipment, energy, funds, and other waste of resources, make the project to create due value. The article combines with the author many years of work experience, and analyzes the deep foundation pit engineering quality control points.
Keywords: deep foundation pit construction process monitoring preparations for construction
中图分类号:O213.1 文献标识码:A文章编号:
引言: 深基坑工程问题在我国随着城市建设的迅猛发展而出现,并且曾造成人们困惑的一个技术热点和难点。科学技术的不断发展使得人们对建筑深基坑的要求更加严格,深基坑工程质量得到了人们的高度重视。面对这一新时期,积极创建良好的工程质量管理制度则变得格外重要。
一施工前的准备工作
1. 选择经济合理的深基坑设计方案
设计方案的合理性是直接影响深基坑支护工程成败的关键因素,一个成功的深基坑支护设计方案应当经济合理、安全可靠、施工技术可行。
设计人员应具有较强力学知识(理论、材料、结构、流体、土力学)和地基与基础等多学科的知识,又要有丰富边坡支护设计经验,熟悉当地的水文地质状况和特点,在结合建筑及周围环境特点的基础上,设计出经济合理的深基坑支护方案。……
