建筑工程造价预结算审查方法及措施

2012-04-10朱平青

城市建设理论研究 2012年6期
关键词:工程造价工程施工

朱平青

摘要:建筑工程预结算作为工程项目投资的重要依据而受建设各方的关注,企业如何对工程造价进行有效控制,对提高建设管理水平,降低投资风险,提高资金的利用率,都具有重要的意义。文章主要阐述了工程造价的计价方法及预结算审查的内容,并提出了相关的改善措施,旨在加强工程造价的合理控制及有效地提高造价限额的审核方法。

关键词:建筑工程造价 预结算审查方法措施

Abstract: the construction project as the settlement project investment is an important basis by the attention of all parties and construction, enterprise how to effectively control the cost of the project, to improve the construction management level, reduce the investment risk, improve the utilization rate of capital, has the vital significance. The paper mainly expounds the engineering cost valuation methods and the settlement of the review content, and puts forward the relevant improvement measures, aims to strengthen the reasonable control of the engineering cost and effectively improve the cost limit audit methods.

Keywords: construction project cost the settlement examination measures

中图分类号:F407.9 文献标识码:A 文章编号

1合理选择工程造价的计价方法

1.1单价法编制施工图预算

用单价法编制施工图预算的计算公式为:

单位工程预算直接工程费=[∑(工程量×预算综合单价)] ×(1+其他直接费率)。

单价法编制施工图预算,根据统一的工程量计算规则计算工程量,套用各地区、各部门统一编制的综合单价,其特点是工作量小、计算简单,但在市场价格波动较大的情况下,采用单价法计算的结果会编离实际水平,造成误差,往往需要利用一些系数或价差弥补。

1.2实物法编制施工图预算

1.2.1实物法编制施工图预算的主要公式为:

单位工程预算直接工程费=[∑(工程量×材料预算定额用量×当时当地材料预算价格)+∑(工程量×人工预算定额用量×当时当地人工工资单价)+∑(工程量×施工机械台班预算定额用量×当时当地机械台班单价)]×(1+其他直接费率)

1.2.2实物法编制施工图预算

由于所用的人工,材料和机械台班的单价都是当时当地的实际价格,所以编制出的预算能比较准确地反映实际水平,误差较小,但是,由于采用这种方法需要统计人工、材料、机械台班消耗量,还需要收集相应的实际价格,如果市场信息少,市场价格就难以准确掌握,因而工作量较大,计算过程繁琐。……