徐州荆马河污水处理厂扩建工程设计与运行
2012-03-23邱明景爱民
邱明 景爱民
摘要:介绍了徐州市荆马河污水处理厂扩建工程(首期5X104 m3/d)采用强化A2/O工艺+微絮凝过滤工艺的设计及运行情况。该项目要解决一期工程和扩建工程由于处理程度不同但又共用辅助设施,需要在处理工艺、水力流程及共用设施上协调,利用现有预留设施,确保经济、合理地使扩建工程出水达到《城镇污水处理厂污染物排放标准》GB18918-2002一级A标准。
关键词:扩建强化A2/O微絮凝过滤一级A设计运行
Abstract: the article introduces the design MaHe xuzhou city sewage treatment plant expansion project (the X104 m3/5 d) the reinforced A2 / O process + micro flocculation the design and operation of the filtering process. The project will have to deal with A phase of the project and expansion project of different levels as A result of treatment but share auxiliary facilities, need in the process, hydraulic process and common facilities to coordinate, USES the existing obligate facilities, ensure that economic and reasonable make expansion project of the water reached the urban sewage treatment plant emissions standards "GB18918-2002 level 1 A standard.
Keywords: expansion strengthening A2 / O micro flocculation filter level 1 A design operation
中图分类号:S611文献标识码:A 文章编号:
工程概况
荆马河污水处理厂服务于国家淮河流域水污染防治重点城市徐州市经济技术开发区,设计总规模为20 X104 m3/d,工程分期建设,一期工程10 X104 m3/d规模于2004年3月投入运行,采用改良A2/O工艺,设计出水水质达到《污水综合排放标准》(GB8978-1996)一级标准。一期工程除预处理及二级处理设施按10 X104 m3/d规模建设外,其余设施土建均按远期20 X104规模建设。
随服务区域污水量增长及江苏省对污水处理厂出水标准的提高,徐州市决定对荆马河污水处理厂进行扩建,扩建工程规模10 X104 m3/d,首先扩建5 X104 m3/d,出水水质要求达到《城镇污水处理厂污染物排放标准》 (GB18918—2002)中的一级A标准。扩建工程于2010年4月动工,于2010年12月通水,概算投资8566万元。
扩建工程设计
2.1 设计进出水水质
根据一期工程进水水质的特点及处理要求,扩建工程进出水水质指标见表1。
2.2 扩建工艺流程
扩建工程工艺流程图见图1。
图1 扩建工程工艺流程图
城市污水首先经过厂内预处理部分,包括粗格栅、进水泵房、细格栅及曝气沉砂池,预处理部分设施是为了提升污水以及保证后续处理构筑物设施、设备的正常运行;……