关于高边坡排架技术的研究与应用
2021-08-17周毅
周毅
【摘 要】在现如今的水电工程项目建设过程中,排架施工技术的应用是非常普遍的,但是对于水电工程来讲,因为施工环境和施工条件比较特殊,所以现如今还没有系统性的、针对性比较强的水电施工安全技术规范。论文对高边坡排架施工技术进行深入研讨,对当前实际施工过程中的排架技术应用进行论述,使施工过程能够更加顺利,保障施工作业安全性以及施工质量。
【Abstract】In the current construction process of hydropower projects, the application of shelving construction technology is very common. However, for hydropower projects, because of the special construction environment and construction conditions, there is no systematic and targeted technical specification for the safety of hydropower construction. The paper carries on the thorough discussion to the high slope shelving construction technology, and discusses the application of shelving technology in the current actual construction process, so that the construction process can be more smooth, and the safety and construction quality can be guaranteed.
【关键词】高边坡排架;施工技术;应用
【Keywords】high slope shelving; construction technology; application
【中图分类号】TU731.2;TU312+.1 【文献标志码】A 【文章编号】1673-1069(2021)08-0190-02
1 引言
在水电工程项目施工过程中,高边坡是施工过程中遇到最多的问题,对于工程项目的整体施工进度及施工质量都会产生非常严重的影响。所以就高边坡问题如何进行解决,在当前的实际施工过程中是在不断进行研究及思考的。高边坡排架施工技术,是现如今工程项目建设中应用比较多的一种技术,在实际应用过程中取得了较好的应用效果,对工程项目的整体进度保障以及质量保障发挥了非常重要的作用。所以在本文论述内容中,就将对高边坡排架施工技术的研究及应用进行探讨。
2 工程概况及影响
2.1 工程概况
雅砻江锦屏一级水电站泄洪雾化区边坡及下游河道防护工程,施工中右岸危岩体位于右岸导流洞以及厂房尾水洞出口区、右岸供料线供电铁塔、雾化区边坡、下游围堰及二道坝上方,出露高程为2040~2276m,距下游围堰顶高差为379~615m。危岩体下方唯一主通道7#公路從危岩体下方1925~1947m高程穿过山体(隧洞编号为7S2隧洞,进口高程约1925m、出口高程约1947m)。……