Anglo American,Grosvenor Mine,Moranbah 4744,Australia

Keywords:Gas drainage Floor fracking UIS drilling

ABSTRACT A series of gas inrush events occurred during development at Grosvenor Mine resulting in exposure to elevated levels of methane at the production face.A total of 22 gas inrush events occurred,with between 15 and 130 m3 of methane released during each event.The presence of an undrained seam in the immediate floor,geotechnical characteristics of the floor,and the stress environment all contributed to these dynamic floor events,while the geological characteristics of the seam below,such as the seam thickness and ash content of 75%,prevented effective predrainage.However,events only occurred in headings mined parallel to the principal horizontal stress direction.In cut-throughs (C/T) perpendicular to the principal stress direction no events occurred,and higher methane levels were observed at the production face.The solution to preventing the gas inrush events involved creating a conduit in the interburden between the mined seam and the seam in the immediate floor to allow the gas to be drained during the development of the headings,as occurred in the cut-throughs(cut-through and cross-cut are regional terms that are analogous).A series of underground inseam (UIS)holes were drilled using the directional drill rig with the aim of fracturing this interburden ahead of the face and promote floor failure to allow the gas to release consistently.The floor fracturing was conducted using water pressure generated from a longwall salvage pump,with the current UIS drilling equipment retrofitted with a series of subs,packers and a fracturing tool.The packers and the fracturing tool were shifted to desired locations along the drilled UIS borehole to achieve the required fracture.The fractures were monitored using a proving hole and with a HYDAC data logger attached to the salvage pack,with the results analysed on the surface to ensure connectivity to the working seam.

1.Background

During the development mining process in panels MG103 and MG104 at Grosvenor Mine a series of gas inrush events occurred,impeding safe mining operations.A total of 22 gas inrush events occurred in the gateroads,releasing between 15-60 m3of methane in 20 of these events,and between 120 and 130 m3of methane in the other two events.

The presence of an undrained source of methane in the immediate floor,the Goonyella Middle Lower (GML) seam,was considered the likely source (Fig.1).The geotechnical floor characteristics and the loading environment contributed to a dynamic floor failure resulting in the release of methane.

The GML seam is a thin carbonaceous layer varying from 0.3 to 1.0 m in thickness(Fig.2),with a high ash content of approx.75%,and residual gas content of 2-4 m3,based on compliance cores.

The data gathered in the previous 18 months from these gas release events proved that when the interburden between the mined Goonyella middle (GM) seam and the GML seam below was between 1.0 and 5.0 m in thickness there was an increased likelihood of the gas inrush events.The 5B section is the lower 1.5 m of the GM seam,the gas content for this section was used in analysis due to 0.3 m of coal routinely left during development production.

All gas inrush events occurred approximately 5.0-15.0 m behind the development production face,sometimes under the continuous miner,and all events occurred in headings,with the cut-throughs having a higher measured methane content and no events observed.

Fig.1.GML seam location relative to GM seam.

Headings at Grosvenor Mine are mined parallel to the principal horizontal stress direction (approx.37° from North),and the cutthroughs are mined perpendicular to the principal horizontal stress direction.This results in increased floor and roof deformation in the cut-throughs,confirmed through FLAC modelling (Fig.3).This FLAC model was validated using instrumentation data from sonic extensometers,shear strips,load cells and instrumented bolts installed at several sites throughout Grosvenor Mine,with the range of modelled roof/rib movements and the movements biased locations consistent with the range obtained through the installed instrumentation.This FLAC model reinforced the theory the GML seam was the source of the methane by showing increased deformation in the cut-through floor,while reduced deformation in headings.

The immediate floor between the GM seam and the GML seam consisted of interbedded siltstone and mudstone,with a strength of 30-40 MPa.Typically,the floor deteriorated when water pooled,but otherwise remained quite competent.The geotechnical characteristics,such as the density,clay content and thickness,resulted in the floor remaining competent enough to act as a barrier in the headings at the production face,allowing the methane to build up in the GML seam below.

2.Understanding the zone

A neural network analysis was conducted in order to better understand the zone of floor inrush events.This method was previously used successfully at Grosvenor Mine in understanding the development roadway roof conditions[2].The properties considered included:interburden thickness between GM and GML;UCS (MPa) for 4 m interval of the floor;GML seam gas content(m3/t) as measured by surface to seam gas compliance boreholes;5B gas content (m3/t);and depth of cover (m).

The neural network analysis is a method of machine learning that defines the relationship between identified variables and the outcomes.It is an iterative learning process with the weighting associated to each property adjusted each time.The advantage of this method is its high tolerance for noisy data and ability to classify patterns on which it has not been trained.The results from this analysis correlated with the real world gas inrush events represented as blue circles in Fig.4.

3.Defining the problem

Fig.2.Goonyella Middle Lower (GML) seam.

Fig.3.Comparison of heading and cut-through modelled fracture networks [1].

Fig.4.Neural network analysis of properties relating to gas release events [3].

The problem faced required either predraining the GML seam or creating a conduit between the GML seam and the GM seam at the production face in headings.Prior to introducing proactive interburden fracturing the following controls were trialed,with limited success:

(1) Multiple underground in seam gas drainage holes were drilled into the GML seam.However the limited accuracy of the drilling program over long distances when targeting a narrow horizon resulted in limited effectiveness in predrainage;

(2) Changing the thickness of the interburden by adjusting the height of the floor horizon,both increasing the competent coal floor and lowering the horizon into the stone floor;

(3) Additional ventilation via an extra auxiliary to the development face and venturis on the continuous miner;

Flying back to Anchorage, I couldn t help thinking of him. I tried to rationalize my failure to help by assuming government agencies, churches and charities were there to feed him. Besides, you re not supposed to give money to panhandlers.

(4) Floor holes drilled with the auger behind the continuous miner into interburden.

The limited success with the predrainage approach resulted in Grosvenor Mine adopting a proactive interburden fracturing regime to encourage a conduit between the GML seam to the GM seam at the development production face.Hydraulic fracturing is a method of stimulating gas production by injecting fluid under pressure into the coal formation to create fractures.This approach is not commonly used in Australia within underground coal [4].However,this method has been trialed in coal seams to increase predrainage with some success,with trials resulting in increased gas drainage occuring in Soldier Canyon Coal Mine in Utah and Dartbrook Mine in NSW [5-7].

A hydraulic fracture is produced by isolating a section of a borehole using packers and pumping a fluid into the section until the pressure results in a fracture opening [8].Continued pumping forces fluid into the fracture,extending it deeper into the rock.Fracture geometry near the borehole wall depends on the orientation of the borehole,natural fractures in the coal and rock,and insitu stresses[9].Horizontal hole fracturing can be used to connect boreholes with over lying coal,forming a conductive channel through the stone [8].This formation of a conductive channel to degas problematic units is considered a primary reason for carrying out hydraulic fracturing [10].

Fig.5.Proactive interburden fracturing holes-highlighted in green.

Zhang et al.performed hydraulic fracturing in Nantong Coal Mine using water with promising results,with some zones experiencing a tenfold increase in gas drainage [11].However,zones of elevated horizontal stresses requiring fractures in coal had limited success.The natural fractures limited the formation of effective,vertical fractures while the high horizontal stress compressed the fractures in the coal.This showed proppant is required in the fracturing fluid when hydraulically fracturing coal to ensure the artifical fractures remain open,while water was successful when fracturing stone.

A solution involving shotfiring and drilling ‘easer’ holes was considered,‘easer’holes are holes drilled 5 m into the floor behind the continuous miner every few metres.However,this is a timeconsuming process.Proactive interburden fracturing could be conducted offline,this allowed the continuous miner and labour to be reallocated during the process and the proactive interburden fracturing to take place where no active mining is occurring,resulting in this being the preferred solution.

4.Method of proactive interburden fracturing

The aim was to create a conduit in the interburden between the GML seam and the GM seam,thus allowing the gas to liberate freely at the production face.The plan involved drilling a series of UIS holes into the interburden and injecting water at high pressure to hydraulically fracture it.Fig.5 displays the two zones proactive interburden fracturing took place,with the drilled fracturing holes highlighted in green,initially at MG104 27-31C/T and again at MG105 20-25C/T.

Water was chosen as the fracturing fluid as it was believed that the interburden material,once fractured,would remain open,unlike coal where fractures regularly close once the pressure is released.Some success using water only fractures had previously been reported,with Dartbrook Mine trialing a similar program involving 5 min of injection at 160-170 L/min (total volume of 800-900 L) resulted in increasing the gas rate per metre of borehole by a factor ranging from 2 to 3 [12].

The site gas drainage equipment was retrofitted with a series of subs,packers and a fracturing tool to initiate the hydraulic fracture within the drilled UIS hole (Fig.6).The subs connected the different parts,the packers inflated to block the borehole either side of the fracturing tool,and the fracturing tool emitted a water jet to fracture the hole at that location.A longwall salvage pump was used,capable of up to 350 bar pressure,and a holding tank with a maximum capacity of 1500 L supplying the water.The UIS equipment had a maximum hole length of approximately 600 m.

A single borehole was drilled into the interburden,with a second ‘proving’ borehole into the GM seam.The proving holes purpose was to provide confirmation of connectivity between the fractured borehole in the interburden and the GM seam.Initially the proving hole was kept empty,and an outflow of water from this hole during fracturing was considered proof that fracturing had propagated into the GM seam,in combination with a pressure gauge at the salvage pump registering a sudden pressure drop.After difficulties monitoring the proving hole and limited data from the pressure gauge,it was decided to fill the hole with water and monitor the pressure of both the interburden and proving hole by connecting a HYDAC data logger to the salvage pump.A successful fracture in the interburden hole was anticipated to log a significant pressure drop,while the proving hole would log a change in pressure.

Fig.6.Fracturing tool with packers attached.

Fig.7.Fracturing hole,fractures and proving hole relative to seam locations.

Fig.8.Example of positive fracture data using the HYDAC logger.

Fig.9.MG105 20-25C/T fracture locations.

Fractures were conducted at 9 m intervals along the interburden hole,with the logged data analysed on the surface to determine if a fracture propagated to the GM seam.Fig.7 displays the location of the interburden hole (red line),the fracture locations along its length(blue circles),and the proving hole in the GM seam(blue lines).

5.Results

Proactive interburden fracturing initially occurred in MG104,with 92 fractures resulting in either drops in pressure recorded on the gauge or returns in the proving hole.Locations that failed to have positive results required the floor to be shotfired immediately behind the continuous miner to ensure a conduit between seams was opened.Zero gas inrush events occurred in the fractured zone.

Due to the positive results in MG104,proactive interburden fracturing was implemented again at MG105 20-25C/T,with a total of 171 fracture attempts made in three separate boreholes.MG105 implemented the HYDAC data logger,increasing the ability to confirm when fractures propagated to the GM seam compared to the pressure gauge.Of the 171 fractures,54 failed to show a positive fracture result in the proving hole pressure data measured using the HYDAC data logger,with the remaining 117 successful.

A successful fracture occurred when a conduit was opened between the GML and GM seam,confirmed by the pressure data recorded in the proving hole.Fig.8 displays a successful fracture log,where a sudden drop in pressure is recorded after 20 s of injection,from 215 to 95 bar.The proving hole showed minor changes after 30 s but failed to show dramatic changes as hoped.

Fig.9 displays the fracture locations,with green circles/diamonds representing successful fractures,and red circles/diamonds no connection to the proving hole logged(the red zones).Locations that failed to show a successful fracture to the GM seam required the floor to be shotfired during development,a process that resulted in significant delays.

The MG104 proactive interburden fracturing was deemed a success after zero gas inrush events occurred in the zone of fracturing.However,when replicated in MG105,the fracturing failed to create the required conduit,and several gas inrush events occurred prior to implementing the shotfiring and ‘easer’ hole solution.The failure in MG105 could be attributed to two major factors:

(1) UIS drilling program lacked the accuracy required to target the desired horizon in the interburden.Picking up the ‘as mined’ proved that the survey tool used had a significant error which could not be determined while drilling.

(2) The thickness of the interburden through this area was thicker than previous locations,with the thickness being between 5 and 6.5 m,this meant that the required pressure was greater than previously,and the horizon required to fracture different.When the interburden is thinner (2-3 m) any hydraulic fracturing of the interburden increases the likelihood of a conduit being formed.When the interburden is thicker(5-6.5 m)only a vertical fracture will assist in forming a conduit between GML and GM.The direction of the fracture will always depend on the in-situ stress ratio at that location and cannot be changed by the method of delivery.

6.Conclusions

If proactive interburden fracturing was implemented successfully there were significant benefits.These included:the ability to perform the required work offline where no active mining is taking place,the continuous miner and labour can be reallocated to a different panel while fracturing occurred;and as Grosvenor Mine had most of the available equipment and labour,the costs of the program were minimal.

Proactive interburden fracturing in MG104 was deemed a success and resulted in reduced risk of exposure to increased methane levels,no gas events occurred post fracturing.This result was not achieved in MG105,with several gas inrush events occurring in the fractured zone prior to Grosvenor Mine implementing the shotfiring and easer floor hole solution.

The reasons for the unsuccessful proactive interburden fracturing in MG105 include the uncertainty regarding the accuracy of the drilling within the interburden,the direction/magnitude of the fractures,and the effectiveness of the fractures when mining in the zone.These were the most significant hindrances to success,and limited the effectiveness of the proactive interburden fracturing program.This suggests this method may be more successful where the accuracy of the drilling can be easily confirmed,or the direction/magnitude of the fractures is less vital,such as when the interburden was 2-3 m in MG104.

Acknowledgements

The authors thank Anglo American for supporting this work and for permission to publish this paper.Also acknowledge Trent Griffiths,Rob Nowell and Gary Needham’s assistance in developing the concept and strategy.In addition,Raymond Kostowski for managing the project and the RADCO team for operating the drilling and fracturing equipment.