APP下载

预制装配式混凝土桥梁结构2019年度研究进展

2020-12-14张子飏邓开来徐腾飞

土木建筑与环境工程 2020年5期

张子飏 邓开来 徐腾飞

摘 要:預制装配式结构具有施工速度快、占用场地少、构件质量高、建造过程绿色环保等显著优势,是实现建筑工业化的可靠途径,近年来获得了学界、工业界的高度重视。在桥梁工程领域,预制装配式混凝土桥梁结构得到了快速发展,针对预制装配式混凝土桥梁结构的研究快速增加,诸多新型预制装配式混凝土桥梁结构已应用于实际工程。总结2019年预制装配式混凝土桥梁结构的研究进展,从下部结构与上部结构两个方面论述了该领域内的新技术、新构造以及典型工程应用。经过总结发现:预制装配式桥墩的连接构造及其抗震性能是本领域的研究重点,也是阻碍装配式桥梁结构向高烈度地震区发展的关键问题;预制装配式上部结构中,基本预制构件之间的连接构造形式受到大量学者的关注,连接构造的抗裂能力,疲劳性能等有待进一步提升,旨在实现“等同现浇”的力学性能。

关键词:预制装配桥梁;装配式桥墩;装配式桥面;桥梁快速建造

中图分类号:U445.47   文献标志码:R   文章编号:2096-6717(2020)05-0183-09

收稿日期:2020-04-02

基金项目:国家自然科学基金(51708466、51778535)

作者简介:张子飏(1995- ),男,博士生,主要从事装配式桥梁结构抗震性能研究,E-mail: zzyzzy0512@gmail.com。

徐腾飞(通信作者),男,博士,副教授,博士生导师,E-mail: tengfeixu@swjtu.edu.cn。

Received:2020-04-02

Foundation items:National Natural Science Foundation of China (No.51708466, 51778535)

Author brief:Zhang Ziyang (1985- ), PhD candidate , main research interest: seismic performance of assembled bridge structures, E-mail: zzyzzy0512@gmail.com.

Xu Tengfei (corresponding author), PhD, associate professor, doctorial supervisor, E-mail: tengfeixu@swjtu.edu.cn.

Abstract: Prefabricated structure hasthe advantages of accelerating the construction, saving energy and resource, and mitigating the impact on the environment. Prefabricated structure is a reliable way to realize the industrialization of buildings. In recent years, researchers and design engineers have carried out studies on the prefabricated structure. In the field of bridge engineering, due to the rapid development of prefabricated concrete bridge structures, research on prefabricated concrete bridge structures has increased rapidly, and many new prefabricated concrete bridge structures have been applied in practical engineering. This paper presents state of the art on prefabricated concrete bridges in 2019, in views of prefabricated substructure and prefabricated superstructure to discuss the new technology, new structure and typical engineering applications in this field. From the summary of this paper, it was found that the structure of connection and seismic performance of prefabricated bridge piers are the focuses of the research in this field. It is also a key issue that hinders the construction of prefabricated bridge in high intensity region. In the prefabricated superstructure field, the connection structure between the basic prefabricated components has attracted a lot of researchers attention. The crack resistance and fatigue performance of the connection structure need to be further improved, aiming to achieve the 'emulative' mechanical properties.

Keywords:prefabricated bridge; prefabricated pier;prefabricated deck; accelerated bridge construction

与传统混凝土桥梁施工相比,预制装配化施工能加快建造速度,节约资源、能源,既降低环境对施工的干扰,又降低施工对环境(含既有交通)的影响,提升建设质量与安全水平等。……

登录APP查看全文