土建安装工程的预埋预留施工配合

2020-09-10张丽娟

国际建筑学 2020年7期

张丽娟

摘要:土建安装工程通常包括电气、通风、给排水以及设备安装等内容,在土建工程施工中需要做好安装工程的预埋预留施工设置,为后续安装工程做好准备,才能保证后续工程的顺利进行。土建安装工程预埋预留的施工配合是保证安装工程施工质量的关键内容之一,在進行预埋预留施工配合时需要注意其施工要点,遵循相应的规定和准则,通过有效的措施控制施工质量,才能保证工程顺利完成。

关键词:土建;安装工程;预埋预留;施工配合

Abstract: The civil engineering installation project usually includes electrical, ventilation, water supply and drainage, equipment installation and other contents. In the civil engineering construction, it is necessary to do a good job in the embedded and reserved construction settings of the installation project to prepare for the subsequent installation project, so as to ensure the smooth progress of the subsequent project. The construction cooperation of embedded reservation in civil engineering installation project is one of the key contents to ensure the construction quality of installation project. When carrying out the construction cooperation of embedded reservation, we need to pay attention to its construction points, follow the corresponding regulations and guidelines, and control the construction quality through effective measures, so as to ensure the smooth completion of the project.

Keywords: Civil engineering; installation engineering; embedded reservation; construction cooperation

一、前言

土建安装工程的预埋预留是土建工程施工中一项十分重要的环节,预埋预留施工中做好相关要求和规范,并且提高施工配合程度,有利于提升工程质量。目前土建安装工程的预埋预留施工中有一些常见问题,解决这些问题并注意进行良好控制,可以更好地完成土建安装工程的预埋预留施工。为此,土建安装工程的预埋预留施工中,研究施工图纸方案,做好施工前的人力、材料等准备,对施工内容进行细节化处理,从各方面进行约束和监管,为预埋预留施工提供更好的条件,都是提升施工配合质量的重要策略[1]。

二、土建安装工程的预埋预留

土建安装工程的预埋预留是土建工程中十分重要的环节,比较常见的预埋预留项目包括电气、通风、给排水以及其他设备安装等,不同的项目在预埋预留安装中需要注意的内容也不完全相同,既需要根据实际情况进行考量,也需要遵循相关行业规范。……