浴室装修快装工装设计分析
2019-12-19廖利民
廖利民



摘 要:文章针对酒店浴室设施装修中的安装问题,进行了分析与探讨。首先,对我国当前酒店浴室装修存在的问题进行了分析,并结合酒店浴室的实际要求,进行了初步分析,对浴室产品的模块化及工装设计的新思路进行论述。最后,详细探讨了快速工装的构思、设计、优化的开发过程。希望能够找到一种新的设计方案,解决现在酒店情况多变、施工工期长的痛点。
关键词:酒店浴室设施;项目交期;快装工装
中图分类号:TU824+.2 文献标志码:A 文章编号:2095-2945(2019)35-0090-02
Abstract: This paper analyzes and discusses the installation problems in the decoration of hotel bathroom facilities. First of all, this paper analyzes the problems existing in the current hotel bathroom decoration in our country, and, combined with the actual requirements of the hotel bathroom, makes a preliminary analysis and discussion on the modularization of bathroom products and the new idea of tooling design. Finally, the conception, design and optimization of rapid tooling are discussed in detail, in the hope of finding a new design scheme to solve the pain point of the changeable situation of the hotel and the long construction period.
Keywords: hotel bathroom facilities; project delivery date; quick fitting tooling
引言
浴室设施是酒店中非常重要且具有高度隐私性的设施。在社会大众对居住空间功能要求不断提升的背景下,酒店浴室设施的设计备受各方重视。在目前时间就是金钱,科技就是生产力的经济大发展前提下,现实中的酒店浴室设施建设周期长与酒店经营使用者要求缩短项目交期的矛盾日益凸显。如何在保证质量的前提下,缩短酒店浴室设施的建设周期,成为一个困扰施工方和酒店使用者的大痛点。
1 我国酒店浴室设施中问题分析
对于我国而言,目前市面上各个酒店浴室的高度不一(由于我司常规的几款产品基本涵盖了常见的长宽尺寸,在此不讨论长宽对酒店浴室设施装修的影响),造成酒店浴室设施的尺寸多变、规格繁多,基本上是:一个浴室对应一个高度尺寸。这些都增加了施工的难度,造成项目交期延长,效率低。等到交房时,经常造成工程项目交期延后,使用方依照合同扣除工程款项的情况,引发承建方和使用方之间的矛盾。……