ABSTRACT:The HaDebute hydropower plant is located in The upper of the EErQiSi River ,The total installed capacity is 4*50 MW, Belong to the runoff type unit ,planning to combine to the grid in 2014,220kV system access The Zhong Shan converting Station, after put into operation , The HaDebute hydropower is not only provide power support for the east Aletai power grid, also is the power regualor for the east Aletai power grid, This paper aimed at the winter load , The HaDebute hydropower combine to the grid. Its influence for The Operation mode in Aletai.
KEY WORDS: Aletai Power Grid; The HaDebute hydropower; the winter; Voltage regualor.
摘要:哈德布特水電厂位于额尔齐斯河上游干流河段,总装机容量为4*50兆瓦,属于径流式机组,计划于2014年并网发电,以220千伏系统接入220千伏钟山变电站,哈德布特水电站投运后,不仅可以为阿勒泰东部电网提供可靠的电源支撑,也是阿勒泰东部片区电网冬夏季主要的调压电源,本文主要针对冬季小负荷,电网无功过剩时,哈德布特水电厂的投运对电网运行方式的影响进行分析和讨论。
关键字: 阿勒泰电网;哈德布特水电厂;冬季;电压调节
0 引言
阿勒泰地区电力负荷主要为露天矿冶及农灌负荷,受负荷性质和网架结构影响,在冬季负荷低谷时段,片区电网无功过剩问题极为突出,自2010年220千伏钟齐线投运后,在冬季小方式下均是通过停运220千伏钟齐线来进行电压调整,220千伏钟齐线停运后,在后夜负荷低谷期阿勒泰片区末端电压仍然保持在121千伏-123千伏,电压偏上限运行。
哈德布特水电厂并网发电后,冬季单机运行进相功率超过10兆瓦时,可基本满足网内大部分220千伏、110千伏、35千伏变电站运行要求,但是电网东部末端青河、青格里、库兰变存在时段性越限问题。当哈德布特水电厂全停时,富蕴变、青河变、青格里变等东部末端站电压越限运行问题较为严重。
针对阿勒泰电网冬季电压越上限问题,通过对哈德布特水电厂开机方式及东部片区最小预测负荷来进行潮流计算,综合分析东部片区电压运行情况,并提出综合建议,确保片区电网安全可靠供电。……