核电厂稳压器下封头电加热元件安装区开孔补强计算
2018-04-12鲁佳李焕鸣邓丰李冬慧胡彧田雅婧
鲁佳 李焕鸣 邓丰 李冬慧 胡彧 田雅婧
【摘 要】压水堆核电厂稳压器下封头通常需要开70-90个布置较为密集的电加热元件安装孔。本文采用RCC-M和Н-ППУ-01两种压水堆核能设备强度计算标准对某核电工程稳压器下封头电加热元件安装区进行补强计算。经计算,采用两种标准对下封头电加热元件安装区域开孔补强计算均满足相应标准要求。
【关键词】稳压器;开孔补强;多开孔;RCC-M
中图分类号: TM623 文献标识码: A 文章编号: 2095-2457(2018)04-0137-002
Nuclear power plant voltage regulator under the head of electric heating elements Installation area opening reinforcement calculation
LU Jia LI Huan-ming DENG Feng LI Dong-hui HU Yu TIAN Ya-jing
(Key Laboratory of Nuclear Reactor System Design Technology, Chengdu 610000, China)
【Abstract】The pressure head of PWR nuclear power plant usually needs to open 70-90 electric heating element mounting holes which are more densely arranged. In this paper, RCC-M and Н-ППУ-01 two kinds of pressurized water reactor nuclear equipment strength calculation standard of a nuclear power project under the header heating element mounting area reinforcement calculation. After calculation, two kinds of standards are used to meet the corresponding standard requirements for the reinforcement calculation of openings in the installation area of the lower header electric heating element.
【Key words】Regulator; Open hole reinforcement; More openings; RCC-M
0 引言
稳压器是压水堆核电厂反应堆冷却剂系统的主要设备之一。功能是通过稳压器内的喷雾头和电加热元件联合配合来补偿一回路冷却水温度变化引起回路水容积的变化或调节一回路冷却剂的工作压力,以防止一回路系统设备由于压力过高而损坏或由于压力过低造成堆内冷却剂产生容积沸腾而引起燃料棒过热烧毁的事故[1]。
稳压器下封头上垂直安装着70~90根电加热元件,安装方式是电加热元件套管垂直冷装在下封头的电加热元件孔中,电加热元件与电加热元件套管焊接。因此,稳压器下封头通常需要垂直开70~90个贯穿孔,并且这些孔在下封头较为密集布置。稳压器作为核一级设备,各部分基本尺寸的初步确定基于可靠的强度计算。目前,国内核一级设备设计一般是基于压水堆核岛机械设备设计和建造规则[2](RCC-M)和ASME[3]第III卷,而RCC-M和ASME第III卷标准对于核一级设备开孔补强计算基本相同。俄罗斯原子能部制定的壓水堆船用核蒸汽发生装置管道和设备强度计算标准[4](Н-ППУ-01)同样可用于压水堆核设备的补强计算。……
