大跨度铁路桥连续梁施工关键技术的相关分析
2018-03-17张悦程
张悦程
摘要: 近几年,在建筑行业不断发展的背景下,桥梁建设技术也实现了突破,其中,大跨度铁路桥连续梁施工成为了主要结构方式,不仅能有效提高建筑结构的质量水平,也能有效提升项目安全性和稳定性,具有非常关键的社会影响力和实用性价值。本文对大跨度铁路桥连续梁施工原理、影响因素和误差调整方法进行了分析,并着重对技术路径展开了讨论,以供参考。
Abstract: In recent years, with the continuous development of the construction industry, breakthroughs have also been made in the technology of bridge construction. In particular, the construction of long-span railway bridges and continuous beam has become the major structural mode, which can not only effectively improve the quality of the building structure, but also effectively enhance project safety and stability, with a very critical social influence and practical value. This paper analyzes the construction principle, influential factors and error adjustment methods of long-span railway bridge continuous beam, and emphatically discusses the technical route for reference.
关键词: 大跨度铁路桥连续梁;原理;技术
Key words: long-span railway bridge continuous beam;principle;technology
中图分类号:U445 文献标识码:A 文章编号:1006-4311(2018)08-0152-02
1 大跨度铁路桥连续梁施工概述
1.1 原理
在桥梁建造的过程中,大跨度铁路桥连续梁建构项目要按照标准化流程顺序有序开展,保证施工过程中整体力学结构的完整性。要想对其施工原理进行分析,就要对梁端悬臂施工内力和边跨合龙段内力进行分析,整合两者参数的同时,判定受力情况。前者要求从整个桥梁的墩顶部位进行施工,其整体施工过程和施工要求更加接近于T型梁结构,这种参数模型在大跨度铁路桥连续梁施工过程中,要保证最长的悬臂受力最小。后者主要是指边跨合龙过程要控制在支架上,待施工项目结束后,整个施工拆除支架的过程要按照标准化流程有序开展,尤其是在实际施工体系建立后,要利用一次性落架的操作方式保证桥墩的固定效果,将桥梁结构的另一端直接搭建在桥梁的固端梁结构上,结合结构力学的相关形式,能有效平衡弯矩参数。……