源码重构优化WCET
2018-01-15孟凡奇苏小红代成雷
孟凡奇+苏小红+代成雷
摘要: 关键词: 中图分类号: 文献标志码: A文章编号: 2095-2163(2017)06-0173-05
Abstract: To make it clear whether refactoring can optimize WCET, the basic theory of WCET estimation is firstly analyzed, and then the basic principle of WCET optimization is proposed. According to the principle, seven refactoring methods are selected from traditional source code refactoring to optimize WCET. The experimental results show that source code refactoring can reduce WCET, but the result is affected by the configuration of target processor, the control structure of testing program and the optimization level of the compiler. Compared with the traditional compilerbased performance optimization, source code refactoring is more suitable to be used at an early phase of program development. Reasonable usage of refactoring will be helpful to repair timeliness defect in time and then guarantee the timeliness safety of software.
0引言
最差情况执行时间(worstcase execution time, WCET)是指程序P在目标处理器X上的执行时间T,对于任何输入,P在X上的执行时间都不会超过T。在实时系统中,尤其是新兴的、安全关键的信息物理系统,例如,汽车的主动刹车系统、无人机的自动巡航系统、智能电网的继电保护系统等,程序的执行时间通常是至关重要的,即使是在最差情况下也不能超出截止期,否则可能造成灾难性后果。因此,WCET已经成为评估软件时效安全性的一个非常重要的指标和参数。
为了获得理想的WCET,程序员会在性能优化阶段(通常是在系统开发后期)利用编译器对目标代码进行优化 \[1\]。然而,随着信息物理系统的兴起,程序的规模越来越大,结构也越来越复杂,上述做法面临以下问题:首先,优化时机太迟,如果WCET无法满足要求,此时修复时效缺陷的成本会远高于编码阶段;其次,优化对象是目标代码,只能在程序具备编译、链接条件后才能优化,且优化后的目标代码不具备可移植性;最后,优化依赖于编译器,且以平均性能的优化为主,优化WCET的效果并不稳定;此外,编译器优化还会给代码调试造成不便,因而在早期编码阶段常常被禁用。
事实上,为了保证软件的时效安全,安全关键实时系统的开发应当采用时间预算法\[2\]。即,在设计阶段为每一个组件预先分配一定资源,包括执行轨迹和执行时间。编码时,程序员要时刻关注每个组件的WCET,一旦发现超时,则认为程序存在时效缺陷,应立即予以修复\[3-4\]。……