大城水库坝顶溢流面板堆石坝、粘土均质坝碾压试验

2017-11-30陈业妮

中华建设科技 2017年10期

陈业妮

【摘要】砼面板堆石坝是自上世纪80年代以来发展最快的一种新型堆石坝,具有施工速度快、造价低、受地形地质条件影响小的优点,同时也具有砼面板容易开裂,质量控制较难的缺点。施工前,均需针对当地材料进行现场碾压试验,通过碾压试将所得的干容重、孔隙率、渗透系数、颗粒级配以及最优含水量等指标与设计指标相比较,以确定坝体填筑时的施工工艺。本文是对昌宁大城水库施工的碾压试验的总结,供同行参考。

【关键词】碾压试验;灌水法;单环注水渗透试验;双环注水渗透试验;大环刀

【Abstract】Concrete concrete face rockfill dam is the fastest growing since the last century, a new rockfill dam, with the construction speed, low cost, by the terrain geological conditions of small advantages, but also has a concrete panel easy to crack, quality control Difficult shortcomings. Before the construction, the local materials should be carried out on-site rolling test, through the rolling test will be the dry capacity, porosity, permeability coefficient, particle size and optimal water content and other indicators compared with the design indicators to determine the dam Fill the construction process. This article is a summary of the rolling test for the construction of the Dacheng Reservoir in Changning for reference by peers.

【Key words】Rolling test;Irrigation method;Single ring water infiltration test;Double ring water infiltration test

1. 工程概況

(1)大城水库工程位于云南省保山市昌宁县以南勐统乡坝塘山河上游段,勐统河流域的一级支流,属怒江水系。

大城水库工程是云南省重点水利工程,主要是为农田灌溉服务,总库容1085.00万m3,灌溉面积4.36万亩 ,Ⅲ等中型水库,概算投资约1亿元。枢纽工程由主坝、副坝、溢洪道、1#输水、泄洪、导流遂洞和2#输水隧洞、渠道等组成(主坝剖面图见图1)。

(2)主坝为坝顶溢流砼面板堆石坝,是云南省第一座坝顶溢流面板堆石坝,坝顶高程1825.30m,最大坝高45.30m,坝顶宽7.00 m。大坝包括砼面板、趾板、垫层区(包括特殊垫层区)、过渡区、主堆石区、次堆石区以及上游铺盖区和下游抛石区,还包括坝顶结构、溢洪道和消能建筑等。主要填筑方量:坝体主堆石填筑:111160 m3, 坝体次堆石填筑44110 m3,过渡料填筑12780 m3,垫层料(包括小区垫层料)填筑12850 m3。见图1。

副坝坝型为粘土均质坝,坝顶高程1825.30m,最大坝高15.30 m,坝顶宽5 m,坝顶长47.04 m。主要填筑方量:坝体粘土填筑:15415 m3。……