基于蒙特卡洛法的输变电工程造价风险评估模型研究

2017-10-17黄小龙

现代电子技术 2017年20期

黄小龙

摘 要: 针对输变电工程建设的诸多不稳定因素与复杂情况所造成的造价不确定问题,结合输变电工程特点,分析工程造价内容与风险识别,给出输变电工程造价概率分布函数和蒙特卡洛算法框架,构建基于蒙特卡洛法的输变电工程造价风险评估模型。并对模型进行计算机仿真计算,得出变电站工程的造价风险,以及工程结余率为80%时的工程造价。

关键词: 输变电工程造价; 风险评估; 蒙特卡洛法; 计算仿真

中图分类号: TN911?34; TP391.77 文献标识码: A 文章编号: 1004?373X(2017)20?0178?03

Abstract: The cost of power transmission project construction is uncertain due to the instable factors and complex situation. In combination with the characteristics of the power transmission project, the content and risk identification of project cost are analyzed. The probability distribution function of power transmission project cost and the framework of Monte?Carlo algorithm are given, and the Monte?Carlo method based risk evaluation model of power transmission project cost is constructed. The computer simulation and calculation are performed for the model to get the cost risk of substation project, and project cost that the surplus rate of the project cost is 80%.

Keywords: power transmission project cost; risk assessment; Monte?Carlo method; computational simulation

随着输变电工程建设的不断增多,输变电项目投资成本、环境复杂度和不确定因素也在不断增长,导致工程造价的不确定,且会面临着工程项目延期、安全事故和停工等风险,所以需要结合输变电工程特点,分析工程造价内容与风险识别,进而构建风险评估模型来评估影响各风险因素的大小。本文提出了一种基于蒙特卡洛法的输变电工程造价风险评估模型,并结合风险管理原则提出输变电工程各个阶段工程造价风险规避策略[1?2]。

1 造价风险评估模型建立

蒙特卡洛法是根据随机过程与经验建立概率分布模型,并设置参数来对输变电工程造价风险因素进行分析[3?4]。基于蒙特卡洛法的输变电工程造价风险评估步骤为:

(1) 确定风险来源,根据工程项目特点与各组成部分并结合历史经验来确定风险来源;

(2) 確定各风险源的概率分布,根据以往采集的输变电工程数据资料,并加之各影响因素,确定风险的概率分布函数;……