浅谈交口抽渭灌区排水系统改造标准的确定
2016-08-16董旭明黄经合
董旭明 黄经合



摘 要:本文结合交口灌区排水工程现状及存在的问题,说明排水工程对交口灌区的重要性和排水工程急需改造的迫切性,并通过交口灌区42年来三日暴雨频率计算,验证了交口灌区排水工程改造排水标准与原排水设计标准相吻合,本次改造工程仍维持原设计标准不变。
关键词:排水标准;径流模数;排渍标准;防止盐碱化标准
On the intersection of pumping Wei River irrigation drainage system transformation standard to determine
Dong Xu-Ming, Huang Jin-he
Abstract: In this paper, the intersection of irrigation drainage works current situation and existing problems, explain the importance of the drainage works on the intersection of irrigation area and drainage works in need of transformation of urgency, and through the intersection of irrigation district 42 years on the 3rd storm frequency calculation to verify the intersection of Irrigation Drainage Workstransformation of drainage standards consistent with the original drainage design standards, the renovation project the original design criteria remain unchanged.
Key words: drainage standards; runoff modulus; Underground Drainage standards; to prevent salinization of standards
1.交口灌区排水工程概况及存在的问题
陕西省交口抽渭灌区位于关中平原东部,是一个灌排并举的大型电力抽水灌区。灌区西起临潼区石川河,东到大荔县沙苑地区,东西长48.6km;南起渭河北岸,北到蒲城卤泊滩,南北宽31.9km。地理坐标为北纬34°33′20″到34°50′00″,东经109°15′25″到109°48′45″。辖灌西安、渭南两市所辖的临潼、闫良、临渭、富平、蒲城和大荔六个县(区),设施灌溉面积126.2万亩,有效灌溉面积112.96万亩。
1964年到1990年,先后进行4次排水工程建设,建成了比较完善的自流和抽排相结合的排水体系,设计排水控制面积117.7万亩。灌区排水工程布设六大排水系统和四座排水站。装机29台套,总容量4775 kW,最大排水能力38 m3/s,最高扬程为9.6 m,架设输电线路52.17 km,建有干沟4条、总长度86.77 km,支沟55条、总长度324.36 km,斗、农沟592条、总长度660.65 km,干支沟建筑物1789座,斗农沟建筑物2225座。
交口排水工程自建成后,发挥了巨大的工程效益,取得了显著成效,基本控制了灌区地下水位上升,盐渍化得到有效控制,盐碱地得到彻底改良。
灌区排水系统运行至今已四十多年,由于年久失修、建筑物设计标准低、自然侵蚀及人为破坏因素,致使沟岸坍塌、淤堵十分严重,甚至出现大部分分毛沟被填埋耕种现象,使排水系统瘫痪,排水功能丧失。……