APP下载

风电场Z形接地变保护整定问题探讨

2016-03-21榆林供电公司陕西榆林719000

电气技术 2016年1期

张 娜(榆林供电公司,陕西 榆林 719000)



风电场Z形接地变保护整定问题探讨

张娜
(榆林供电公司,陕西 榆林719000)

摘要随着风电场大量接入系统,风电场的稳定运行已经密切影响系统网络运行的安全性。以某风电场系统为例,分析了接地故障发生后相关设备的零序网络,针对接地变速断值的选取、过流保护与零序过流保护间可能失配引起的保护误动,提出了优化方案,风电场的安全稳定运行表明该方案的可靠性。

关键词:电容电流;接地变;整定计算

Disscussion on Protection Setting Problems of Z Grounding Transformer in Wind Power

Zhang Na
(Yulin Power Supply Company, Yulin, Shaanxi719000)

Abstract Along with the increasing proportion of wind power capacity in the grid, the grid power security is closely related to the stable operation of wind power. Based on a case of wind power system,this paper analyzes the zero sequence network when a single-phase grounding fault occurs to the power. The optimizing scheme is suggested to the two questions: one problem is how to configure the quick-breaking value, and another one is that mismatching of the over current protection an the zero sequence current leads to the malfunction. The safe and stable operation of the wind power system suggests that the scheme is feasible.

Keywords:capacitance current; grounding transformer; setting calculation

由于风电场集电线路长、分支多且大量使用电缆,系统对地电容电流越来越大,接地故障产生的弧光过电压等一系列问题,严重影响电网安全。为此,风电场35kV或10kV侧大部分采用小电阻接地方式。但接地变速断过流保护按规程要求可能躲不过区外单相接地时流过接地变的最大故障相电流,易引起保护误动,速断、过流保护动作逻辑根据规程要求不利判别故障所在设备,过流保护与零序过流保护间可能失配引起保护误动,增大风电场安全运行压力。本文以某风电场接地变保护误动事件为例,分析动作原因,提出相应预防措施,防止类似问题的发生。

1 风电场现状

1.1风电场一次主接线

如图1所示,风电场装机容量49.5MW,有33 台TW1500/87型号风机,分3组(1组10台、2组 12台、3组11台)通过集电1线、集电2线、集电3线汇集至35kV母线,再由110kV升压变并入系统。

图1 某风电厂电气主接线图

1.2Z形接地变

接地变压器电源侧装设三相式的电流速断、过电流保护,作为接地变压器内部相间故障的主保护和后备保护;……