APP下载

基于区域信息融合的风电场平均年发电量预测

2015-09-06王娜等

湖南大学学报·自然科学版 2015年8期

王娜等

摘要:备选风电场在寿命周期内的平均年发电量是风电场宏观选址的一个重要参考判据.为了提高风电场平均年发电量的预测精度,提出了一种基于风电场附近多个气象站长期测风数据的区域信息融合的平均年发电量预测方法.首先分别建立各气象站与风电场同期小时风速之间的相关模型,应用相关模型得到多个长期小时风速预测值,再用神经网络对长期小时风速预测值进行融合处理得出最终的小时风速预测值,在此基础上进行风电场平均年发电量的估算.仿真结果表明:本文提出的区域信息融合方法对年平均发电量的预测误差比采用单一气象站数据的预测误差最高可降低11.32%.

关键词:平均年发电量;测量相关预测;信息融合;神经网络

中图分类号:TM315 文献标识码:A

Average Annual Energy Output Prediction Based

on Regional Information Fusion

WANG Na1, SHAO Xia1,GAO Yunpeng1,WAN Quan2

(1.College of Electrical and Information Engineering, Hunan Univ, Changsha,Hunan410082 China;

2.State Grid Hunan Electric Power Company Research Institute, Changsha,Hunan410007,China)

Abstract:Annual energy output of a candidate site in its life span is an important reference criterion of wind farm macro siting. A regional information fusion method, which allows the use of multiple reference wheather stations with a long history of wind speed and wind direction measurements, was proposed to improve the annual energy output prediction accuracy. Firstly, the correlation model was established between the shortterm wind data of a single reference wheather station and the candidate wind farm, and the multiple longterm wind speeds of candidate site based on different reference stations were predicted by using the model. Then, the multiple prediction results were integrated by neural network to obtain the final longterm hourly wind speed data, and the annual energy output was subsequently determined on the basis of the knowledge of these wind speeds. The simulation results show that, by using the proposed method, the error reduction up to 11.32% has been achieved in the relative error of the average annual power output, with respect to the case of using a single reference wheather station method.

Key words: average annual energy output; measurementcorrelatepredict(MCP); information fusion; neural network

风能资源评估是风电场选址的关键,其中备选风电场在整个寿命周期内的平均年发电量是一个重要的参考判据.风电场的寿命周期通常为20~25年,在此期间平均年发电量的估算受风速变化(日变化、季节变化、年际变化)影响较大,要准确地进行评估至少需要数年甚至数十年的风速观测数据,这样才能减少由于风速变化带来的不确定性[1].但是,在实际工程的规划阶段不可能用如此长的时间来收集现场数据.在缺乏备选风电场长期可靠风速记录的情况下,广泛采用测量-相关-预测算法(MCP,MeasureCorrelatePredict)来进行风资源评估,即在备选风电场址处设立测……

登录APP查看全文