APP下载

Tunnel Construction

2014-04-06

隧道建设(中英文) 2014年12期

TunnelConstruction

ANNUALCONTENTS(Vol.34,2014)

ExpertForum

Views on Key Technical Issues of Construction of Taiwan Strait Tunnel

SUNJun(No.1-1)

Tunneling by TBM/shield in China: State-of-art,Problems and Proposals

WANGMengshu(No.3-179)

Development and Application of Construction Technologies for Underground Water-sealed Energy Storage Caverns

HONGKairong(No.3-188)

Challenges and Prospectives of Construction of Long-distance Inclined Shafts of Coal Mines by Shield/TBM

HEChuan(No.4-287)

Reform of Investment and Financing System of Infrastructures in Mainland China: Experience from TOD of Urban Rail Transit Works

ZHUXiaobing(No.5-397)

Challenges in Construction of Underwater Tunnels and Countermeasures

QIANQihu(No.6-503)

Prospects on New Technologies of Super-large Diameter Shield Machine for Qiongzhou Strait Tunnel

CHENKui(No.7-603)

Countermeasures for Deep and Thick Soft Foundation under Serious Back-silting Condition: Case Study on Artificial Island and Immersed Tunnel of Hong Kong-Zhuhai-Macao Bridge Project

SUNJun(No.9-807)

Environment Issues of Tunnels and Their Countermeasures

GUOShanyun(No.9-815)

Promoting TBM in Tunnel Construction in China

QIMengxue(No.11-1019)

Research

Experiment on Mechanical Property of Straight-wall Semicircle-arch Concrete-filled Steel Tube Support and its Application

GAOYanfa,WANGJun,HUANGWanpeng,CHENBinghui,WANGLiang,WANGChao(No.1-6)

Highway Tunnel Surrounding Rock Deformation Prediction Model Based on Support Vector Machine Optimized by Ant Colony Optimization and Its Application

QIUZhigang(No.1-13)

Georobot-based Automatic Deformation Monitoring in Tunnel Construction

FANBen,ZHENGJiqiang,ZHUKundian(No.1-19)

Study on Rapid-hardening High-performance Simultaneous Grouting Material for Shield-bored Tunnels

XUJianping,LINWenshu,XUKe,LINJianping,WANGBiao,MIAOQiang,DingQingjun(No.2-95)

Study on Ground Penetrating Shield-bored Tunnel Calculation Parameters in Modified Routine Method

ZHANGYinping(No.2-101)

Study on Water-tightness and Pumpability of Shield Tail Sealing Grease

WANGDeqian(No.2-107)

Mixing Proportion of and Key Construction Technologies for Extruded Concrete Lining of Utility Tunnels

LIWenjun(No.2-111)

Study on Influence of Excavation of Foundation Pit on Deformation of Underlying Tunnel in Complex Ground

ZHAOJun,GANPenglu,SHENWenming,LIUWei(No.2-118)

Analysis on Cost of Shield Boring across Hard Rocks

SHILiu,LIGuangtao(No.2-124)

Study on Instability of Excavation of Deep Tunnels Considering Disturbance Action of Vibration

LVXiangfeng(No.2-129)

Application of Wireless Sensor Network Technology in Tunnel Deformation Monitoring and Disaster Prevention

JIZhong(No.2-134)

Comparison and Contrast between TGP206 and TSP203 Advance Geology Prediction System: Advantages of TGP206

LIUYunzhen(No.3-198)

Development of Additives Dedicated for Preparing High-performance Simultaneous Grouting Material

ZHOUShaodong,LINWenshu,WANGHongxi,XUKe,LINJianping,WANGBiao,DINGQingjun(No.3-205)

Study on Control of Hot and Humid Environment in TBM Driving of Zhongtianshan Extra-long Tunnel

WANGJinzhong(No.3-212)

Case Study on Structural Safety of Large Cross-section Tailrace Tunnel of Huangjinping Hydropower Station

YIZerong,YANGChao,WANGYusuo(No.3-216)

Analysis on Influence on Lining of Existing Railway Tunnel Imposed by Blasting Construction of Water-releasing Tunnel

KONGJinghua(No.3-221)

Deformation of and Numerical Analysis on Foundation of Wangjingxi Station on Line 13 of Beijing Metro Caused by Shield Tunneling below

ZHANGWenzheng(No.3-226)

Influence of Deformation Joint Spacing on Internal Force of Tunnel under Active Fault Movement

LIXuefeng,DAIZhiping,GUXueying,CAOZihao(No.3-237)

Analysis on Application of AHP Method in Selection of Cut-and-Cover Method

ZHULi,TIANHaiguang,YUANYong(No.3-243)

Analysis on Cutting-off of Non-fire-fighting Power Supply of Metro Stations

GUOLi(No.4-298)

Analysis on Influence of Construction of Deep Foundation Pit on Adjacent Buildings: Case Study on GZH-5 Bid Section of Dongguan-Huizhou Inter-city Rail Transit Project

WANGKaichun(No.4-303)

Analysis on Influence of Excavation of Foundation Pit of Municipal Tunnel on Existing Underlying Shield-bored Metro Tunnel

GAOQiang,YUWenlong(No.4-311)

Study on Minimum Distance between Centers of Tracks of Main Lines of Urban Rail Transit Works When Single Crossover is Set into Curve

ZHANGWenzheng,ZHANGZhiya,YINHuatuo,SHILonglong(No.4-318)

Partial Factor Method for Structure Calculation of Highway Tunnels

GUOXiaohong,SHUHeng,TUOYongfei(No.5-402)

Comments on Equipment Selection for Ventilation during Long-distance Dead-end Tunneling

SUNZhenchuan,GOUHongsong(No.5-408)

Characteristics of and Suggestions for BT Mode in Metro Construction in China

ZHUOFacheng,PANWeidong,BAIYun(No.5-413)

Analysis on Influence of Size Effect on Excavation Stability of Caverns in Jointed Rock Mass

CHENWenyi,YANGChaoshuai(No.5-418)

Analysis on Complicated Deep Metro Foundation Pit Supported by Ring Plate Substructures: Case Study on Wangjiadun Center Station on Line 3 of Wuhan Metro

LIUZhaogang(No.5-423)

Behavior of Combined Support Structure Consisting of “Large-diameter High-pressure Jet Grouting Piles + Double-row Borehole Cast Piles”

HUANGJun,CHENFangwei,ZHAOGuang,XINGDongdong,XIAOJunhua(No.6-508)

Case Study on Engineering Geological Conditions and Problems in Construction of Headrace Tunnel of CCS Hydropower Station in Ecuador by TBM Method

YANGJihua,QISanhong,GUOWeixin,YANGFengwei,LOUGuochuan(No.6-513)

Deformation of Uplift Piles and Its Influence on Calculation of Metro Station Structures

ZHANGYueming(No.6-519)

Analysis on Construction Safety of Optimized Double Side Drift Method

GUOJie(No.6-525)

Research on Shield Boring Attitude Control Based on Fuzzy PID Algorithm

GONGGuofang,HONGKairong,ZHOUTianyu,HOUDianqing,WANGLintao(No.7-608)

Roadmap for Metro Owner’s Project Risk Management

HUHao(No.7-614)

Analysis on Strength Concept in Uzbekistan Concrete Codes

CHENHongguang(No.7-619)

Study on Classification Methods of Surrounding Rock of Underground Powerhouse of CCS Hydropower Station

YANGJihua,GUOWeixin,QISanhong,ZHANGDangli(No.7-623)

Structural Seismic Analysis on a3-storey Metro Station with Retaining Walls

LIUJun,SHENXiaowei(No.7-629)

Field Test and Analysis on Stress of Lining of Large-Diameter River-crossing Shield Tunnel

LIANGYu,SUWenhui,FANGLigang,YANGJunsheng(No.7-637)

Experimental Study on Shear Properties of Interface between Segment of Shield Tunnel and New Composite Structure after Exposure to High Temperature

YANGCheng,YANZhiguo,ZHUHehua(No.7-642)

Study on Application of Different Self-adapting Kalman Filtering Methods in Data Processing in Settlement Prediction of Metro Tunnels

FANLeigang,TIANLinya,CHENXifeng(No.7-649)

Study on Feasibility of China-Nepal-India Railway Crossing Himalayas

GUFangfang,SHIZhenming,ZHENGYanlong,BAIYun(No.7-653)

Study on Range of Pressure on Tunnel Face of Earth Pressure Balanced Shield and Its Influence on Ground Surface Settlement

GONGQiuming,MOUShanqing,JIANGHouting,LUDechun(No.8-707)

Analysis on and Optimization of Construction Scheme of Closely-spaced Metro Tunnels with Different Cross-section Dimensions

DINGGaigai,JIANGHai,KONGXiangxing(No.8-715)

Study on Boring Parameters of Composite EPB Shield in Sandy Cobble Strata and Study on Ground Deformation Rule

YANGXiaohua(No.8-721)

Comparative Simulation Analysis on Applicability of Different Karst Cave Treatment Methods in Tunneling

ZHANGJianguo(No.8-731)

Development and Application of New Automatic Traverse Survey Robot

LVHongquan(No.8-737)

Application of Multiple Linear Regression Method in Compilation of Norm of Water Pumping in Tunneling

ZHANGHenghui(No.8-745)

Engineering Geological Properties of Soft Surrounding Rocks of Mountain-crossing Tunnels and Construction Countermeasures

ZHANGJianru(No.8-749)

Analysis on Rigidity of Primary Support of Composite Lining and Its Influencing Factors

LIChunqing,LIANGQingguo,WUXuyang,SUNKai(No.8-754)

Study on Blasting Vibration Control of Shallow Tunnel Based on HHT Analysis

ZOUDechen,WANGHailiang,WANGChunhui,LIChuan(No.8-760)

Analysis on Causes for and Renovation of Floor Structure of a High-speed Railway Tunnel Located in slightly-dipping Interbedded Rock Mass

WANGLichuan,XIAOXiaowen,LINHui(No.9-823)

Static and Dynamic Calculation and Feasibility Analysis of Ningdong Railway Crossing above a Water-conveyance Tunnel

CHENQiang,LIUFeng,XIANGHuawei,WANGShuguo(No.9-837)

Study on Waterproofing Joints of Segments in GPST Method

NINGZuoli(No.9-844)

Excavation Scheme Comparison and Secondary Support Installation Timing of Highway Tunnel in Water-containing Poorly-cemented Powder-fine Sandstone

DONGLei,SONGHongyan(No.9-849)

Experimental Study on Preparation and Filter Membrane Formation of Slurry during Hyperbaric Operation in Tunneling by Slurry Shield

MINFanlu,JIANGTeng,WEIDaiwei,ZHANGYazhou(No.9-857)

Survey and Research on Estimation Method of Against-inrush Safe Thickness of Rock Strata in Karst Tunnels

LIJi,LUHao,XIAYuanpu(No.9-862)

Field Experimental Study on Characteristics of Surrounding Rock Pressure of Mined Tunnel under Aircraft Dynamic Load

CHAOKai,TANZhongsheng(No.9-873)

Analysis on Characteristics of and Causes for Defects of Coal Measure Section of Jiazhuqing Tunnel

LIUWei(No.10-921)

Study on Optimization of Parameters of Primary Support of Metro Tunnel

ZHANGTao(No.10-926)

Shield Boring of Metro Tunnel Perpendicularly Crossing Underneath Existing Tunnel: Analysis on Influence of Shield Boring on Existing Tunnel

KANGZuo,DAIGuanghui(No.10-931)

Comparative Study on Structural Types of GINA Gaskets Used in Immersed Tunnel

HUZhinan,YANGPeng,SHANChao,RENYuzheng,DANGDing(No.10-937)

Study on Long-term and Short-term Working Behavior of Composite Wall of Super-deep and Super-large Working Shaft

LIXiaochun(No.11-1024)

Study on Strata Deformation Characteristics of Dynamic Construction of Overlapping Shield Tunnels with Different Intersection Angles

ZHOUJianjun,YANGZhenxing,GUOLu(No.11-1031)

Application of Parameter-adjustment-based Selecting Weight Iteration Method in Cross-section Monitoring of Metro Works

HELei,CHENHao,SUIXiuzhen(No.11-1036)

Feasibility Study and Discussion on Tunnel Excavation by Water Jet Technology

WANGDong,LIYongsheng,GOUHongsong(No.11-1042)

Exploration of Zones Disturbed by Metro Construction and Estimation of Grouting Reinforcement Effect

CHENNing,LIUChao(No.11-1049)

Study on Control of Ground Surface Settlement: Case Study on Adjacent Tunnel Tubes of Shenzhen Metro

ZHAOJingjing,SUWenji(No.11-1055)

Study on and Execution of Large-scale Underground Reinforced Concrete Structure without Expansion Joints: Case Study on Futian Underground Comprehensive Transportation Hub

LIUKading(No.12-1113)

Analysis on and Monitoring of Influence of Blasting Vibration of Highway Tunnel on Adjacent Water Conveyance Tunnel

LIUTuo(No.12-1126)

Study on Acceleration Mechanism of Liquid Alkali-free Accelerating Components

HEXiongfei,ZHANGXun(No.12-1131)

Analysis on Influence of Construction of Mining Tunnel on Nanjing-Hexian Inter-city Railway Crossing Underneath Existing Freight Railway Tunnel

PENGHongxia,CHENGYunyan,WANGHuaidong(No.12-1137)

Case Study on Transverse Ground Surface Settlement of Land Section of Shiziyang Tunnel Bored by Shield

YANGYandong,CHENKui,LIFengyuan,ZHOUJianjun(No.12-1143)

Study on Cyclic Use of Waste Clay in Preparing Slurry for Slurry Shield Boring

JIANGTeng,YAOZhanhu,MINFanlu(No.12-1148)

Planning&Design

Analysis on Transfer Modes between Existing Double-track Metro Stations of Beijing Metro with Long-term Metro Stations

SHIGuangyin(No.1-24)

Case Study on Design of Highway Overcrossing Existing Railway Tunnel

ZHOUChao(No.1-32)

Numerical Analysis on Design of Protection Measures for Ancillary Structures of Wangchengpo Metro Station

WANGLin,TANPeilian,WANGGen(No.1-41)

Analysis on Transposition of Line 3 and Line 5 of Suzhou Urban Rail Transit in the Industrial Park

XIJun,SUNYuanguang(No.1-48)

Sustainable Development of Underground Space: Case Study on Optimized Design of Anti-floating of Underground Parking Garage of Yitian Village in Shenzhen,China

LIUKading(No.2-140)

Design of Qiansanmen Tunnel of Beijing Underground Rail Transit Line Crossing above Existing Metro Connection Gallery and Existing Power Tunnel

GUOJianyong(No.2-147)

Design of Support of Deep Foundation Pits in Hard-soft Heterogeneous Ground

ZHAOWenqiang(No.2-153)

Design of and Study on Embedded Channels of Segments of Shield-bored Tunnels of Line 9 of Shenzhen Metro

DUFeng(No.3-249)

Analysis on Influence of Arrangement Mode of Cooling Towers of Air-conditioning System of Metro Stations on Ground Surface Environment

LIANGYan,TANGChunhua(No.3-254)

Experience in Planning and Construction of Suzhou Rail Transit Works

LIANGChuangjia(No.3-259)

Case Study on Selection of Proper Retaining Structures for Different Types of Foundation Pits of Nanhulu Xiangjiang River Crossing Tunnel in Changsha,China

DUANJiandi(No.4-324)

Design and Construction of Underground Space Formed by Jacking Multiple Adjacent Rectangular Pipes

LIXiansen(No.4-331)

Application of Double Side Control Method in Fine-tuning Design of Line Slope of Metro Works

LIUYanchen(No.4-339)

Study on Underpinning of Puzhulu Metro Station on Line 3 of Nanjing Metro to Achieve Integral Launching of Large-diameter Shield Machine

LIUFangming(No.4-343)

Study on Passenger Transfer Modes of Underground Metro Stations

LIGepeng(No.5-428)

Case Study on Design Concept of Chegongmiao Comprehensive Station of Shenzhen Metro

ZENGLiang,LILu(No.5-443)

Case Study on Design of Dangjinshan Super-long Tunnel on Dunhuang-Golmud Railway

LUShiyang(No.5-452)

Architectural Design of Metro Stations in Downtown Area based on Site Environment

YAOXiangui(No.5-460)

Analysis on Influence of Plan Change on Alignment Design of Line 2 of Nanchang Metro

ZHANGZhiya,LIUKejing(No.5-467)

Case Study on Design of Commercial Space above Ancillary Routes of Guangzhou Metro

LUOLiang(No.6-534)

Study on Key Technologies for Geological Route Selection of Long Tunnels Crossing Spring Protection Zone and Goaf

ZHOULu(No.6-539)

Single Double-track Tunnel Tube or Twin Single-track Tunnel Tubes: Case Study on Super-long Yuntunbao Tunnel on Chengdu-Lanzhou Railway

ZHUYong,WUHua(No.7-661)

Analysis on Design Ideas for Business Development of Station Halls of Guangzhou Metro

LUOLiang(No.7-668)

Study on Use of Surrounded Space and Remaining Space of Cut-and-cover Metro Station

YAOXiangui(No.9-880)

Study on Optimization of Design of Mined Running Tunnel Crossing Underneath Large-scale Interchange in Urban Area

ZHANGJinwei(No.9-887)

Comprehensive Development and Utilization of Underground Space in Huaqiang North Commercial Area along Line 7 of Shenzhen Metro

CHENXiangsheng,ZHUYihai(No.10-944)

Case Study on Influence of Separation Wall on Deformation of Large Cross-section Shield-bored Tunnel on No.16 Line of Shanghai Metro

ZHANGZhongjie,YEGuanlin,TANGXiang(No.10-953)

Design Optimization and Construction of Steep Inclined Ventilation Shaft of E’gan Super-long Highway Tunnel

LIUSuo(No.10-959)

Key Technologies for Operation Ventilation Design of Road Tunnels Constructed by Shield Method

ZHANGDi(No.11-1062)

Countermeasures for Shield Cutting and Passing Underneath Piles of Existing Pedestrian Bridge

CHUKejun,ZHAOLiang,XUQian(No.11-1071)

Discussion on Design of Equipotential Bonding in Metro Stations

GAOTing,LIHongxing(No.11-1077)

Theory and Practice of Architectural Design of Entrance/Exit of Metro Station

YAOXiangui(No.12-1153)

Study on Engineering Geological Characteristics of Tertiary Strata of Zhongtiaoshan Tunnel on Menghua Railway

QINZhenggui,CHENYong(No.12-1163)

ConstructionTechnology

New Technologies Applied in Design and Construction of Shanghai Metro Works

BAITinghui(No.1-53)

Key Technologies Applied in Design and Construction of Artificial Islands and Immersed Tunnel of Hong Kong-Zhuhai-Macau Bridge (HZMB) Project

YINHaiqing(No.1-60)

Case Study on Ground Penetrating Shield Technology (GPST)

WUHuiming,ZHOUWenbo,TENGLi(No.1-67)

Key Points in Implementation of Bonded Circumferential Pre-stressing of Yellow River Crossing Tunnel on South-to-North Water Diversion Project

SUNZhenchuan,ZHONGShengxing(No.1-73)

Deformation Monitoring Technology for Deep Surrounding Rocks of Soil Tunnels Based on BOTDR

YINLong,WANGXiaolin(No.2-158)

Construction Survey of Tanba No.4 Spiral Tunnel on Xiaohe-Ankang Highway

NIUChunxia(No.2-163)

Analysis on and Control of Ground Surface Settlement:Case Study on Jiefangdalu Station of Line 1 of Changchun Metro Constructed by Top-down Construction Method under Protection of Cast-in-situ Arch

LIChunkui(No.3-264)

Design and Construction of Heat-keeping Water-proofing and Drainage System of Lafashan Tunnel in Extremely Cold Region

YUESheng,YANGChunbo,YANGYanling(No.3-269)

Tunneling by EPB Shield in Gravel Strata: Case Study on Line 4 of Chengdu Metro

FENGHuanhuan,YANGShujiang(No.3-274)

Hydropower Tunnel in High Geothermal Condition: Influences of High Ground Temperature and Countermeasures

SUHui,ZHANGHong,GENGXinchun,TANGYang,WANGJian(No.4-351)

Comments on Distance between Primary Support/Secondary Lining and Working Face of Inter-city Underground Railway Tunnels

NIEZhenyu(No.4-356)

Case Study on Installation of Shaped Steel Columns in High-strength Rocks in Construction of Chegongmiao Station of Line 11 of Shenzhen Metro

CHENYu,LIHailong(No.4-362)

Application of Automatic Monitoring Technology in Construction of Shield-bored Metro Tunnel Crossing Underneath High-speed Railway in Urban Area

LIMing(No.4-368)

Key Construction Technologies for Shield-bored Tunnel of Chegongmiao Station-Hongshuwan Station Section on No.11 Line of Shenzhen Metro Crossing Closely above Existing Metro Line

LIJianshe,CHENHuichao,LIZheng(No.4-374)

Model Test on Concrete Cutting Directly by Shield and Pile Foundation Cutting Technology

FUDeming(No.5-472)

Discussion on Blasting Excavation Sequence of Closely-spaced Stacked Tunnels in Medium-thick Layered Rocks: Case Study on Dalongshan-Huahuiyuan Running Tunnel on Line 6 of Chongqing Metro

CAIZhenyu,HUANGXu(No.5-478)

Tunneling through Water-rich Fractured Zone with Super-high Water Pressure: Case Study on Zhongtianshan Tunnel

WEIWenjie(No.5-484)

Analysis on Abnormal Data in TGP Advance Geological Prediction in Tunneling and Countermeasures

WEIJunke,ZHAOShaoqiang,CHENTao,LIUJianguo(No.5-489)

Anchoring Cable Removing Technology: Case Study on Hui-Min Shield-bored Tunnel on Line 1 of Zhengzhou Metro

LIGuangliang(No.5-494)

Case Study on Consolidation of Water-rich Cobble Ground in Nanning by means of Soletanche Grouting

WEIChenliang,WANGYuqing,TANGGaohong(No.5-499)

Technologies to Control Serious Deformation of Soft Rocks with High Ground Stress: Case Study on Liangshui Tunnel on Lanzhou-Chongqing Railway

ZHAOFushan(No.6-546)

Problems and Countermeasures in Tunneling by Open TBM in Chongqing Rail Transit Works

ZHANGZhiyong,GUANZhipeng,CHENXiaoping,LIUYongsheng(No.6-554)

Case Study on Blasting and Control Technologies for High Road Channel in Ningguo-Jixi Section on Yangzhou-Jixi Expressway Adjacent to Existing Railway Line

DONGLei,TANGDaoyi(No.6-558)

Case Study on Parallel Cut in Vibration-reducing Blasting of Hard Rock Tunnel in Urban Area

WANGJuntao,WANGHailiang,YANGQing(No.6-564)

Measures to Ensure Rapid Boring of Open TBM Based on “4M+1E” Factors

XUZan,XIEPeicai(No.6-569)

Research on and Application of Technologies for Cutting Tool Replacement under Hyperbaric Condition in Super-large Diameter Slurry Shield Boring

WUZhongshan,YANGZhao,YANGQing(No.7-673)

Technology for Deformation Control of Sujiachuan Large Cross-section Loess Tunnel on Baoji-Lanzhou Railway Constructed by Top Heading and Two-Bench Method

XIHao,LIXugan,SHIJian,HOUQi(No.7-679)

Technologies for Double-shell Support of Tunnels in Soft Rock with Extra-high Ground Stress

SIJianjun(No.7-685)

Measures to Improve Effect of Tunnel Lining Testing by means of Ground Penetrating Radar

ZHANGJiaming(No.7-691)

Treatment of Water Leakage and Freezing of an Operating Railway Tunnel on Ji’ning-Baotou Railway in Plateau and Extremely Cold Region

PANHonggui,WANGZhijie,LIBo,XUCaizhang,QIUYue,GAOFei(No.7-696)

Shield Tunneling Technologies for Xiamen Metro under Complex Geological Conditions

YANGShujiang(No.8-765)

Shield Docking Technologies for Shiziyang Tunnel

DUChuangdong(No.8-771)

Construction Technologies for Shield-bored Tunnel Crossing underneath Chuanshan Interchange

JIAGuangwu(No.8-778)

Automatic Water Pumping Technology for Inclined Shafts: Case Study on No.5 Inclined Shaft of Guanjiao Tunnel

NIUHongpei(No.8-784)

Shield Launching Technology for Running Tunnel on Small-radius Curve with One Single Shaft: Case Study on Line 2 of Dalian Metro

JIWeiguo(No.9-895)

Technology for Supporting Consisting of Systematic Bolts and Steel Arches Applied in Construction of Ingate and Junction Section between Ventilation Tunnel and Main Body of Metro Station

YANGHongshe(No.9-900)

Key Technologies for Rapid Construction of Baidian Tunnel in Tertiary Water-rich Sand Strata

GAOGuangyi(No.9-908)

Numerical Analysis on and Construction Technologies for Underpinning of Existing Underground Commercial Mall on Museum Station-Longjiang Street Station Section of Harbin Metro

DONGDaohai(No.10-967)

Study on Consolidation of Tunnel in Highly-permeable Sandy-gravel Strata by means of Ground Surface Soletanche Grouting

ZHANGMing(No.10-975)

Case Study on Treatment of Pile Foundations Encountered in Construction of Shield-bored Metro Tunnel

HEMaozhou(No.10-981)

Design and Application of On-line Monitoring System and Assessment on Safety of Ground Surface Buildings (Structures) in Metro Construction

LIZhihui,LIUWeijing,LIUWenfeng,GUOXingling,YANGPeng(No.10-990)

Analysis on Conditions for Rapid Boring of Single-shield TBM

YANGBin(No.10-997)

Study on Construction Scheme of Xinzhou Tunnel Crossing Underneath Datong-Yuncheng Highway

WANGHongchang,MAZhifu,ZENGQing,HUANGuangkun(No.11-1082)

Application of Hydraulic Blasting in Excavation of Laogeshan Tunnel

LIUJunjie(No.11-1087)

Countermeasures for Floating of Large-diameter Slurry Shield Tunnel in Soft Soil

WANGXin,LITingping,WANGYinchang(No.12-1168)

Technology for Concreting of Integrated Drainage Ditch and Cable Channel of High-speed Railway Tunnels in One Operation

YINZhonghui(No.12-1175)

Case Study on Consolidation of Water-rich Cobble/gravel Strata in Nanning by means of Soletanche Grouting

RENGuohong(No.12-1183)

Analysis on System Error of Horizontal Angle Survey of CPII Track Control Network of Long Tunnels and Countermeasures

DUZhigang(No.12-1191)

ConstructionMachinary

Analysis on and Countermeasures for Unbalanced Forces on Cutterhead of Large-diameter Shield

HANWeifeng,ZHOUJianjun,LIFengyuan(No.1-78)

Analysis and Control of Grease Consumption of Main Bearing of a Shield

LIDawei,ZHAOXinhe(No.1-83)

Case Study on Refurbishment of Cutterhead and Main Drive of Slurry Shield for Xiangjiang River Crossing Tunnel in Changsha,China

BUZhuangzhi,PUXiaobo,FENGPeipei(No.1-88)

Design and Application of Mountain-climbing Belt Conveyor System: Case Study on West Qinling Tunne

ZHANGXuejun(No.2-167)

Analysis on Causes for Failure of Main Drive Reducer of Shield Machine

CHANGKonglei,ZHAOXinhe,LIDawei(No.2-173)

Finite Element Analysis and Tests on Digging Device of an Open Shield Machine

YANGHaitao(No.3-280)

Development of HMI Configuration of Monitoring System of Shield Machine

TANShunhui,MENGXiangbo,XUShoutian,PUXiaobo(No.4-380)

Prediction of Bearing Comprehensive Rock-machine Experiment Platform based on Phase Space Reconstruction and Least Squares Support Vector Machine

LIHongbo,ZHOUJianjun,WANGZhufeng,ZHANGHepei,RENYingying(No.4-387)

Technical Reform of Electrical System of Rock Drilling Jumbo

SHENGuili,WUChaolai,LIANGYongfei(No.4-392)

Design and Application of a New Rear Propulsion System for Large Cross-Section Rectangular Tunnel Boring Machine

SHENPeijian(No.6-576)

Design and Type Selection of Shields Adaptable to Heterogeneous Ground in Shenzhen,China

TANShunhui(No.6-582)

An Optimized Design of Layout of Thrust Cylinders Fitting for Two Types of Segment Ring Divisions

XIAOJunxiang,YUANWenzheng(No.6-588)

Design of and Study on Advance Timbering ofφ6.22 m Open Shield

CUILishan,WANGJianhui,YANGHaitao(No.6-592)

Design of Electrical Control System of Diesel Locomotive Based on TTC60 Controller

WANGShuangwang,SUNZhihong(No.6-598)

Reform of Hydraulic Oil Tank of Rock-drilling Jumbo and Analysis on Its Heat Balance

WUXiangbin(No.7-703)

Study on Localization of Main Drive Reducers of Shield

LIUJinxiang,CHENKui,SUNShangzhen,FENGHuanhuan(No.8-790)

Reconnection Control System of Frequency-conversion Traction Locomotives Based on PLC

WANGQian,MENGYanlong,SUNZhihong(No.8-797)

Application of Vehicle-mounted Mobile Substation in Construction of Jilin-Tumen-Hunchun Passenger-dedicated Railway

GAOHong(No.8-802)

Comparison of Control Modes of Hydraulic Thrust System of Shields

JIALianhui(No.9-913)

Conceptual Design on a Non-cutterhead EPB Shield

LIJianbin,WANGKai(No.10-1001)

Case Study on Type Selection of Shields for Chengdu Metro

CAOZhi,LIJianxiang(No.10-1005)

Failure Types of Main Bearing of TBM and Analysis on Faults of Main Bearing of TBM Applied in Construction of West Qinling Tunnel

WANGYanbo(No.10-1011)

Analysis on Causes for Damages of Main Bearing of TB880E TBM

ZHANGHongyao(No.11-1092)

Key Technologies for Design of Super-large Rectangular Pipe Jacking Machine

JIALianhui(No.11-1098)

Development of Real-time Monitoring Data Reporting System of Shield Machine

MAQiang,PUXiaobo(No.11-1107)

Study on Synchronous Control Technologies for Cutter Head Driving Motors of Shield

RENYingying,ZHOUJianjun,WANGZhufeng,ZHANGHepei,LIHongbo(No.12-1196)

Design and Application of Cutterhead of Shield Boring in Water-rich Sandy Gravel Strata in Chengdu

ZHANGJianian,HUYujuan(No.12-1202)

Optimization of Arrangement of Thrust Cylinders of Dual-mode Shield for Inclined Tunnel

TAOWei,GUANHuisheng,GUOLichang,HUANGSonghe(No.12-1207)