西秦岭隧道富含地下水段TBM法施工对策探讨

2012-10-19石凤香

城市建设理论研究 2012年10期

石凤香

摘要: TBM通过富水隧洞段时,由于水压作用,工作面会坍塌,掩埋刀盘及机体,增大刀盘的扭矩、甚至出现洞壁坍塌,撑靴无支撑点,TBM不能推进,针对上述可能出现的情况,结合TBM设备本身的特点,有针对性的制定TBM施工通过富水地段的施工方案有注浆堵水加固、适量引排水,洞内排水采用反坡排水,施工效果良好,确保了TBM掘进安全。

关键词:TBM法;富水隧道;施工对策;注浆加固

Abstract: TBM tunnel through rich water segment, the water pressure role because, will face collapsed, buried cutter disc and body, increase the knife dish of torque, appear even the cave walls collapse, supporting boots no anchor, can't promote TBM, in view of the above of what may happen, combined with the characteristics of TBM equipment itself, the authors have formulated the construction of TBM rich water through lots of construction scheme has grouting reinforcement of water, a lead drainage, drainage hole by reverse slope drainage, construction effect is good, ensure the safety TBM tunneling.

Keywords: TBM method; Rich water tunnel; Construction strategies; Grouting strengthening

中图分类号:U445文献标识码:A文章编号:

1 引言

西秦岭特长隧道[1]位于新建铁路兰渝线中段,地处甘肃省东南部重镇—陇南市境内[2],是目前国内采用TBM法施工的最长铁路隧道,该隧道全长28.236km,为左右线分设的两条单线隧道,隧道最大埋深约1400m,进口段以10‰、13‰、7‰上坡,出口段以3‰、4.6‰下坡[3]。隧道限界按时速200km客货共线设计,为全线控制性工程,中铁十八局承担19.8公里长的施工区段,主要采用TBM法施工,TBM开挖直径10.23m,使用连续皮带机出碴。TBM预备洞施工长度为2003m,TBM第一阶段施工掘进任务7962m,之后步进通过2637m的罗家里斜井,罗家理斜井采用钻爆法施工,第二阶段掘进任务7170m,TBM最远掘进距离19803.164m。

隧道穿越的地层岩性为:第四系全新统松散层,石炭系下统砂质千枚岩,泥盆系下统灰岩、千枚岩、下元古界灰岩、变砂岩、砂质千枚岩,断层角砾岩和断层泥砾。隧道穿越的断层为F6全新活动断层及f60、f59、f55、f54四条次生断层,其中TBM施工段主要为砂质千枚岩。此外,本隧道部分地段还存在高地应力、高地温等不良地质条件和富水区。

根据隧道地质条件,TBM通过……