浅谈高层建筑施工过程中的沉降观测
2012-10-15董金
董金
摘要:随着现代大型建筑的不断建设,建筑物周边地层也发生了缓慢变化,为保证建筑物的安全和使用寿命,在施工过程中必须对建筑物周边地层进行相应的沉降观测。本文根据笔者的多年施工经验,从沉降观测记录、沉降观测要点、沉降观测施测过程和相关精度要求四个方面介绍了高层建筑施工过程中的沉降观测。
关键字:沉降观测;施工;高层建筑
Abstract: With the continuous construction of large buildings, the buildings surrounding strata has also undergone a slow change in the construction process in order to ensure the safety and service life of the building, settlement observation on the buildings surrounding strata. According to the author's years of construction experience, this paper from the settlement observation records, the settlement observation points, and settlement observation applied the measurement process and accuracy of the four aspects of high-rise building construction process of settlement observation.Key words: Settlement observation; construction; high-rise buildings
中图分类号:TU855 文献标识码:A文章编号:
随着建筑施工技术的不断改善,越来越多的高层建筑出现在我们的周围。从本文来说,高层建筑主要是指10层以上的住宅及总高度大于24米的各种综合型建筑和公共建筑,一般具有楼层多、高度大等特点[1]。这些高层建筑的出现极大地推动了人类对高空资源的利用,但也带来了相应的隐患。大量高层建筑的出现不仅使得建筑群体地基本身承载的压力增大,还导致周围的地层结构发生了变化。在高层建筑施工过程中进行精确地沉降监测不仅可以有效保证建筑物的安全和使用寿命,还为以后周围建筑的设计施工提供了必要的数据支撑。
沉降观测点的设置
1.1 水准基点的设置
在建筑施工过程中,沉降观测水准基点通常会以工程标高定位时所使用的水准点为准。由于高层建筑的地基面积均较大,水准点间距较大,为保证观测的准确度,还会在建筑物周围单独埋设水准基点。
根据《工程测量规范》(GB50026-93)过时了,已经淘汰!!工程测量规范GB50026-2007的规定,高层建筑周围每一区域中的水准基点应不少于3个,每一观测点的距离应在30~50m之间,并尽量使用不锈钢等耐腐蚀材料作为水准点帽头。……